Laserfiche WebLink
<br />Task 4: Construction Documents (90% and 100% plans) <br />Construction Documents (CDs) shall include finalizing approved deliverables from the Design Development <br />phase. This includes the provision of detailed engineering and construction drawings that will serve as the basis <br />for both bidding and construction by a general contractor. <br />➢ Deliverables shall include 90% and 100% plans, structural calculations, CASP report, final technical <br />specifications, finalized “Opinion of Probable Cost”. 100% plans will go through a constructability <br />review that could lead to comments and recommendations that should also be addressed and completed <br />as part of this deliverable. <br />Plans: Plans shall include, but are not limited to the following: <br />• <br />• <br />Title Sheet <br />Civil Engineering <br />o <br />o <br />o <br />Parking areas <br />Grading And On-Site Drainage Plan <br />Site Utility Plan <br />• <br />• <br />Landscape Architectural <br />o <br />o <br />o <br />Site Layout/Construction Plans And Details <br />Planting Plans/Details/Notes <br />Irrigation Plans/Details/Calculations/Notes <br />Architectural <br />o <br />o <br />o <br />o <br />o <br />o <br />o <br />o <br />o <br />o <br />o <br />Demolition Plans (interior and exterior) <br />Construction Plans (interior and exterior) <br />Reflected Ceiling Plans <br />Exterior Elevations <br />Interior Elevations <br />Mechanical and Plumbing Plans/T-24 <br />Electrical Plans, as applicable <br />Architectural Details <br />Structural Calculations <br />Door/Window/Finish/Hardware Schedules <br />ADA Path of Travel design and/or signage Plan <br />•Structural Engineering <br />o <br />o <br />o <br />Structural Design <br />Structural Calculations <br />Detailing <br />• <br />• <br />Mechanical Engineering & Plumbing <br />o <br />o <br />Include new HVAC system <br />Include new water service meters (1-domestic, 1-irrigation) <br />Electrical Engineering <br />o <br />o <br />o <br />o <br />o <br />o <br />o <br />o <br />Electrical Site Plan (exterior lighting) <br />Electrical Floor Plan (interior lighting) <br />Light fixture schedule <br />Security System <br />Photometrics. <br />Location of panels, switchgear, meters <br />Details <br />Notes, specifications <br />City of Santa Ana RFP 22-095 <br />Page A1-4