My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 16 - Agreements for On -Call Environmental Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
03/21/2023 Special and Regular
>
Item 16 - Agreements for On -Call Environmental Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2024 10:33:33 AM
Creation date
8/11/2023 8:57:20 AM
Metadata
Fields
Template:
City Clerk
Item #
16
Date
3/21/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QocuSign Envelope 10. FC7E9348-8A22-4923-BQ05-AA3CA0439841 <br />DUDEK <br />Task 8. Public Hearing; <br />This task would be the same as outlined for Task 5 under NDs/MNDs. <br />Tasks 9. Final EIR or FIR/EIS <br />Dudek will compile all comments received, and evaluate comments as to their relevance in addressing <br />project impacts. We will collaborate with City staff on appropriate strategies to address the comments <br />received. Dudek staff will draft responses to comments for City staff review, and make any <br />modifications upon receiving comments from staff. <br />Based on the comments on the draft EIR or EIR/EIS, Dudek will prepare an administrative draft final <br />EIR or EIR/EIS. The final EIR or EIR/EIS will include redline/strikeout text to highlight changes in the <br />document, along with an errata chapter, and the comments and responses to comments. <br />Dudek will also prepare a draft mitigation monitoring and report program, which will identify the impacts, <br />mitigation measures, timing of implementation, method of implementation, and responsible parties. <br />Following the review of the administrative final FIR or FIR/EIS by City staff (and the federal lead <br />agency), Dudek will incorporate any revisions and address comments as requested by the City (and the <br />federal lead agency). We will submit a Screencheck version of the Final EIR or EIR/EIS for final review, <br />addressing any final revisions or comments. Dudek will compile the Administrative Record for the City <br />as the project progresses so that we can turn over the files immediately upon project conclusion. <br />Dudek will also work with the City in the preparation of the findings of fact and statement of overriding <br />considerations (if necessary) We will submit draft and final versions of these documents. <br />Technical Studies <br />The preparation of ISs1NDs/MNDs, EIRs, and Elss will require technical analysis to support <br />conclusions made in the documents. Our in-house environmental experts have completed technical <br />studies and environmental reports that cover all environmental disciplines. A consistent theme across <br />all projects is our focus on problem solving and using the right tools to deliver successful outcomes. <br />Engineering Support <br />Our engineers plan, entitle, and design land development and infrastructure projects. We understand <br />the importance of adhering to tight regulations, aggressive schedules, and narrow budgets. <br />Simultaneously, we navigate and comply with conditions of approval to design projects that are <br />practical, economically viable, and realistic given the regulatory environment. Our team includes LEED- <br />accredited staff trained to create environmentally sensitive and low -impact designs that accomplish <br />desired results and produce sustainable infrastructure. <br />Stormwater Drainage and Regulatory Compliance. Our engineers are experts in surface water and <br />stormwater drainage, including hydrology and hydraulic analysis_ We have prepared numerous <br />stormwater pollution prevention plans, water quality management plans, and dust control plans for our <br />clients, and have experience with erosion and sediment control related to environmental compliance. In <br />addition, we prepare environmental constraints analysis, analyzing slopes, drainage, and the geology of <br />a project site. <br />On -Call Environmental Services RFP# 21105 ` <br />
The URL can be used to link to this page
Your browser does not support the video tag.