STEP 1O "L" METAL - INSTALL AT DECK TO WALL TRANSITION, PROVIDE SOLID BACKING AT VERTICAL LEGS
<br />5/8" GYPSUM WALLBOARD FINISH
<br />AND INSTALL WITH A MINIMUM 4" LAP BETWEEN PIECES.
<br />T71
<br />I
<br />I
<br />CORNER FLASH (BEYOND)
<br />STEP02 FLASHING PAN - INSTALL ALONG BOTTOM OF OPENING, SET IN SEALANT AND FASTEN THROUGH
<br />2-HR RATED WALL PER PLAN
<br />— 5/8" GYPSUM WALLBOARD FINISH
<br />5/8" GYPSUM WALLBOARD FINISH
<br />THE VERTICAL LEGS ONLY TO THE ROUGH FRAMING JAMBS.
<br />1-HR RATED WALL PER PLAN
<br />FACTORY FINISHED WINDOW
<br />STEP PLACE DOOR - PLACE THE DOOR IN THE ROUGH OPENING. PLUMB, SQUARE, AND SHIM THE DOOR,
<br />FRAMING PER STRUCTURAL
<br />FRAMING PER STRUCTURAL
<br />SET IN CONTINUOUS SEALANT
<br />THEN FASTEN THE DOOR FRAME TO THE JAMB STUDS.
<br />FRAMING PER STRUCTURAL
<br />FRAMING PER STRUCTURAL
<br />___________ _ _____
<br />APPLY LOW EXPANSION FOAM
<br />STEP@ JAMB S.A.F. ATTACH A STRIP OF S.A.F. ALONG EACH SIDE OF JAMB, ADHERING TO THE ROUGH
<br />SHEATHING MAY OCCUR
<br />SHEATHING MAY OCCUR
<br />SHEATHING MAY OCCUR
<br />ALL FOUR SIDES OF WINDOW
<br />FRAMING AND DOOR JAMB. ALIGN EDGE OF S.A.F. TO INSIDE OF DOOR FRAME JAMB .THE S.A.F.
<br />SHEATHING MAY OCCUR
<br />I
<br />W.R.B. 0/ BUTTERED SEALANT 0/
<br />SHALL OVERLAP THE "L" METAL AND PAN FLASHING AND EXTEND 12" ABOVE THE HEAD ROUGH
<br />2x SOLID BACKING REQUIRED AT
<br />Q
<br />I
<br />/
<br />I
<br />NAILING FLANGE 0/ WINDOW SETTING
<br />OPENING. PRIME SUBSTRATE AS REQUIRED BY S.A.F. MANUF.
<br />S.A.F. WHEN SHEATHING NOT
<br />2x SOLID BACKING REQUIRED AT
<br />/
<br />I
<br />I 2x SOLID BACKING REQUIRED
<br />1
<br />1
<br />2x SOLID BACKING REQUIRED
<br />— SEALANT 0/ SILL PAN S.A.F. 0/ CORNER
<br />-------- --- ---
<br />STEP 5 HEAD S.A.F. -ADHERE S.A.F. ABOVE THE ROUGH OPENING. EXTEND THE S.A.F. 13" PAST THE ROUGH
<br />PROVIDED
<br />S.A.F. WHEN SHEATHING NOT
<br />I AT S.A.F. WHEN SHEATHING
<br />I1
<br />AT S.A.F. WHEN SHEATHING
<br />FLASHING 0/ DOOR HEAD S.A.F.
<br />OPENING AT EACH END. ALIGN THE BOTTOM EDGE OF THE S.A.F. WITH THE BOTTOM OF THE DOOR
<br />PROVIDED
<br />I NOT PROVIDED
<br />I
<br />I i
<br />NOT PROVIDED
<br />S�
<br />FRAME HEAD.
<br />I i 3-COAT STUCCO SYSTEM 0/ METAL
<br />LATH 0/ W.R.B. 0/ 5/8" TYPE "X" DENS
<br />/
<br />Ili
<br />3 COAT STUCCO SYSTEM 0/ METAL
<br />I 3-COAT STUCCO SYSTEM
<br />/
<br />I
<br />3-COAT STUCCO SYSTEM
<br />Ii
<br />�
<br />i s: 7 3-COAT STUCCO SYSTEM 0/ METAL
<br />3 12
<br />LATH 0/ W.R.B.
<br />STEP 5A PLASTER MOULD. - APPLY PLASTER MOULD TO DOOR FRAME ON CONTINUOUS SEALANT. PLASTER
<br />GLASS GOLD EXTERIOR SHEATHING
<br />LATH 0/ W.R.B.
<br />0/ METAL LATH 0/ W.R.B.
<br />(1
<br />0/ METAL LATH 0/ W.R.B.
<br />(
<br />MOULD SHALL ALIGN WITH INSIDE EDGE OF DOOR FRAME. PLASTER MOULD SHALL BE BACK PRIMED.
<br />/ I
<br />/ I
<br />S(
<br />7 W.R.B. 0/ 9" WIDE WEEP S.A.F. 0/
<br />III
<br />I
<br />HEADER PER STRUCTURAL
<br />I I � � APPLIED FOAM TRIM; SEE
<br />STEP 6A CEMCO #3 - INSTALL FLASHING SCREED AS REQUIRED BY DETAIL. EXTEND THE SCREED 2" PAST
<br />HEADER PER STRUCTURAL
<br />/ I
<br />/
<br />HEADER PER STRUCTURAL
<br />I1 2
<br />CEMCO #12 SOFFIT DRIP 0/ W.R.B.
<br />I I I
<br />I
<br />EXTERIOR ELEVATIONS
<br />THE ROUGH OPENING AT BOTH ENDS. SET SCREED ONTO HEAD PLASTER MOULD WITH SEALANT.
<br />I
<br />I
<br />W.R.B. 0/ 9"WIDE WEEP S.A.F.
<br />I I
<br />NOT REQUIRED IF THE DOOR IS PROTECTED BYA MINIMUM 30" DEEP EAVE OR SOFFIT THAT IS
<br />I W.R.B. 0/ S.A.F. 0/ #6 HEAD DRIP
<br />l
<br />i
<br />W.R.B. 0/ S.A.F. 0/ #6 HEAD DRIP
<br />III CEMCO #12 SOFFIT DRIP; EXTEND
<br />I I
<br />0/ CEMCO #3 FLASHING SCREED
<br />I
<br />W.R.B. 0/ SILL PAN S.A.F. (WEEP S.A.F.)
<br />I 0/ CEMCO #3 FLASHING SCREED 0/
<br />J
<br />WITHIN 24" OF THE DOOR HEAD, THE EAVE OR SOFFIT SHALL EXTEND 30" EACH SIDE OF DOOR.
<br />Ij S(
<br />APPLIED FOAM TRIM MAY OCCUR,
<br />III SL
<br />\�
<br />� 2" PAST OPENING
<br />I � S�
<br />0/ DOOR HEAD S.A.F.
<br />—
<br />DOOR HEAD S.A.F.
<br />Z
<br />STEP 6B WEEP S.A.F. -ADHERE 9"WIDE S.A.F. OVER CEMCO #3 FLASHING SCREED. EXTEND THE S.A.F. 2"
<br />12
<br />1 SEE EXTERIOR ELEVATIONS
<br />12
<br />1
<br />APPLIED FOAM TRIM MAY OCCUR,
<br />Z
<br />— SEE EXTERIOR ELEVATIONS
<br />I 1 3;
<br />APPLIED FOAM TRIM; SEE
<br />_ _ _ —
<br />�— g
<br />CEMCO #3 FLASHING SCREED, WHEN
<br />PAST THE CEMCO #3 FLASHING SCREED AT BOTH ENDS; S.A.F. REQUIRED WITH CEMCO #3.
<br />STEPO7 W.R.B. APPLY W.R.B. IN WEATHERBOARD FASHION AROUND THE INSTALLED DOOR.
<br />I
<br />CEMCO #6 HEAD DRIP
<br />I
<br />CEMCO #6 HEAD DRIP, EXTEND 1"
<br />PAST EACH SIDE OF DOOR FRAME
<br />r---J
<br />I
<br />— J � �
<br />I i
<br />EXTERIOR ELEVATIONS
<br />� / �
<br />REQUIRED BY DETAIL 3 THIS SHEET.
<br />-
<br />66 WEEP S.A.F. ADHERE 0/ CEMCO #3
<br />BOND BREAKERSTEP
<br />SET IN SEALANT OVER PLASTER MOULD
<br />II
<br />I BACKER ROD & SEALANT
<br />II
<br />—
<br />I
<br />APPLIED FOAM TRIM MAY OCCUR,
<br />—
<br />I I
<br />W.R.B. 0/ HEAD S.A.F
<br />I
<br />I
<br />CEMCO #3 FLASHING SCREED, WHEN
<br />LOW EXPANSION FOAM
<br />FLASHING SCREED.
<br />STEP@ CEMCO #3 -SET FLASHING SCREED IN
<br />II
<br />II -
<br />SEE EXTERIOR ELEVATIONS
<br />_
<br />I
<br />� z
<br />REQUIRED BY DETAIL 3 THIS SHEET.
<br />APPLY WITHIN SHIM CAVITY
<br />SEALANT TO PLASTER MOULD HEAD.
<br />LOW EXPANSION FOAM
<br />I
<br />g
<br />SET IN SEALANT OVER PLASTER MOULD
<br />STEP(@ PLASTER MOULD - APPLY PLASTER
<br />APPLY WITHIN SHIM CAVITY
<br />PLASTER MOULD 0/ SEALANT 0/
<br />MOULD TO DOOR FRAME ON
<br />1 �
<br />— —
<br />—
<br />PLASTER MOULD 0/ SEALANT 0/ S.A.F.
<br />S.A.F. 0/ DOOR HEAD W/ BEAD OF
<br />SEALANT AT HEAD AND MOULD
<br />�� R� CONTINUOUS SEALANT.
<br />1 2" 1"01
<br />1 2"
<br />BACKER ROD &SEALANT
<br />PLASTER MOULD 0/ SEALANT 0/
<br />S.A.F. 0/ DOOR HEAD W/ BEAD OF
<br />0/ DOOR FRAME HEAD
<br />� G STEP 5 HEAD S.A.F.
<br />HOLLOW METAL DOOR FRAME
<br />PER DOOR SCHEDULE
<br />HOLLOW METAL DOOR FRAME
<br />SEALANT AT HEAD AND MOULD
<br />VERIFY FRAME
<br />DOOR AND FRAME PER DOOR
<br />O
<br />DOOR SHIM
<br />WIDTH WITH
<br />SCHEDULE
<br />"PEMKO"
<br />PER DOOR SCHEDULE
<br />"PEMKO"
<br />DOOR AND FRAME PER DOOR
<br />SCHEDULE
<br />DOOR AND FRAME PER DOOR
<br />HEAD
<br />WALL REQ'MT.
<br />I TN p
<br />DOOR SEAL S88D
<br />DOOR SEAL S88D
<br />SCHEDULE
<br />.:.
<br />OR APPROVED EQUAL
<br />OR APPROVED EQUAL
<br />FOR ADDITIONAL
<br />INFORMATION SEE
<br />DETAILS
<br />DOOR PER SCHEDULE
<br />VERIFY FRAME
<br />HEAD WIDTH WITH
<br />VERIFY FRAME
<br />HEAD WIDTH WITH
<br />DOOR PER SCHEDULE
<br />VERIFY FRAME
<br />HEAD WIDTH WITH
<br />HEAD
<br />VERIFY FRAME
<br />WIDTH WITH
<br />� G '\
<br />r p NIN wl ��
<br />I �w
<br />TRANSOM WINDOW - DOOR
<br />5
<br />WALL REQ'MT.
<br />WALL REQ'MT.
<br />WALL REQ'MT.
<br />WALL REQ'MT.
<br />I°
<br />41,
<br />FACTORY FINISHED WINDOW SET IN
<br />2-HR RATED WALL PER PLAN
<br />1-HR RATED WALL PER PLAN
<br />5/8" GYPSUM WALLBOARD FINISH
<br />N, S
<br />FRAMING PER STRUCTURAL
<br />5/8" GYPSUM WALLBOARD FINISH
<br />CONTINUOUS SEALANT
<br />FRAMING PER STRUCTURAL
<br />FRAMING PER STRUCTURAL
<br />\ I \ Iv
<br />2x SOLID BACKING REQUIRED AT S.A.F.
<br />2x SOLID BACKING REQUIRED AT S.A.F.
<br />FRAMING PER STRUCTURAL
<br />APPLY LOW EXPANSION FOAM ALL
<br />\
<br />2x SOLID BACKING REQUIRED AT S.A.F.
<br />WHEN SHEATHING NOT PROVIDED
<br />FOUR FWINDOW\
<br />OU SIDES S 0
<br />WHEN SHEATHING NOT PROVIDED
<br />WHEN SHEATHING NOT PROVIDED
<br />2x SOLID BACKING REQUIRED AT S.A.F.
<br />SHEATHING MAY OCCUR
<br />WHEN SHEATHING NOT PROVIDED
<br />5/8" GYPSUM WALLBOARD FINISH
<br />SHEATHING MAY OCCUR
<br />1/2"
<br />1/2"
<br />HOLLOW METAL DOOR FRAME
<br />SHEATHING MAY OCCUR
<br />SHEATHING MAY OCCUR
<br />SHEATHING MAY OCCUR
<br />IN HOLLOW METAL DOOR FRAME
<br />IN
<br />PER DOOR SCHEDULE
<br />4 1/2" MINIMUM DOOR AND FRAME PER DOOR
<br />DOOR SHIM
<br />DOOR AND FRAME PER DOOR
<br />PER DOOR SCHEDULE
<br />SCHEDULE
<br />DOOR AND FRAME PER DOOR
<br />SCHEDULE
<br />oGoy
<br />SCHEDULE
<br />I
<br />I
<br />T
<br />—_ — —
<br />—_ — — I
<br />—_ — —
<br />_—
<br />_
<br />STEPO3 PLACE DOOR
<br />— — — — — — — — — J
<br />— —
<br />— —
<br />_
<br />- --- -- -- ----- --
<br />— —
<br />SECTION AA STEP0JAMB S.A.F
<br />F
<br />/ I
<br />_ - — — — —
<br />_ DOOR SEAL "PEMKO" S88D OR
<br />—
<br />— —
<br />DOOR SEAL "PEMKO" S88D OR
<br />APPROVED EQUAL
<br />--- --- — --- J�
<br />—
<br />—
<br />—
<br />FOR ADDITIONAL
<br />PLASTER MOULD 0/ SEALANT 0/
<br />S.A.F. 0/ DOOR JAMB W/ BEAD OF
<br />— SEALANT AT JAMB AND MOULD
<br />�
<br />I ,I — — — — — — — — — —
<br />OUGH OPEN IN WIDTH PLUS 26'f
<br />APPROVED EQUAL
<br />1/2 "
<br />WRAP S.A.F. INTO JAMB AND DOWN 0/
<br />L
<br />PLASTER MOULD 0/ SEALANT 0/
<br />S.A.F. 0/ DOOR JAMB W/ BEAD OF
<br />1/4"
<br />PLASTER MOULD 0/ SEALANT 0/ S.A.F.
<br />0/ DOOR FRAME JAMB
<br />INSTALLATION
<br />INFORMATION
<br />LOW EXPANSION FOAM
<br />-
<br />CN
<br />APPLY WITHIN SHIM CAVITY
<br />WRAP S.A.F. INTO JAMB AND DOWN 0/
<br />"L"
<br />DOOR FLASHING PAN AND "L" METAL
<br />SEALANT AT JAMB AND MOULD
<br />AT WINDOW SEE
<br />DOOR FLASHING PAN AND METAL
<br />BACKER ROD & SEALANT
<br />BACKER ROD & SEALANT
<br />LOW EXPANSION FOAM
<br />APPLY WITHIN SHIM CAVITY
<br />DETAIL
<br />1
<br />JAMB S.A.F. DOWN 0/ DOOR
<br />FLASHING PAN AND "L" METAL
<br />— — — — H
<br />__ ---------- --------------
<br />I
<br />W.R.B. 0/ CEMCO 4" J-SERIES
<br />AD 53
<br />3-COAT STUCCO SYSTEM 0/
<br />W.R.B. O/ CEMCO 4" J SERIES
<br />CASING BEAD 0/ S.A.F. CASING BEAD
<br />JAMB S.A.F. DOWN 0/ DOOR
<br />JAMB S.A.F. DOWN 0/ DOOR
<br />METAL LATH 0/ W.R.B.
<br />I 10 /
<br />CASING BEAD 0/ S.A.F.
<br />TO EXTEND UP TO DOOR HEAD
<br />FLASHING PAN AND "L" METAL
<br />FLASHING PAN AND "L" METAL
<br />I ;', STEP05
<br />APPLIED FOAM TRIM MAY OCCUR,
<br />APPLIED FOAM TRIM MAY OCCUR,
<br />APPLIED FOAM TRIM MAY OCCUR,
<br />APPLIED FOAM TRIM MAY OCCUR,
<br />APPLIED FOAM TRIM MAY OCCUR,
<br />SEE EXTERIOR ELEVATIONS
<br />! HEAD S.A.F.
<br />I ADHERED
<br />SEE EXTERIOR ELEVATIONS
<br />SEE EXTERIOR ELEVATIONS
<br />SEE EXTERIOR ELEVATIONS
<br />SEE EXTERIOR ELEVATIONS
<br />JAMB
<br />STUCCO SYSTEM 0/
<br />JAMB
<br />JAMB
<br />STUCCO SYSTEM 0/
<br />JAMB
<br />3-COAT STUCCO SYSTEM 0/
<br />JAMB
<br />W.R.B. 0/ BUTTERED SEALANT 0/
<br />I STEP@
<br />3-COAT METAL
<br />"X"
<br />3-COAT STUCCO SYSTEM 0/ METAL
<br />3-COAT
<br />NAILING FLANGE 0/ WINDOW
<br />I JAMB S.A.F.
<br />LATH 0/ W.R.B. 0/ 5/8" TYPE DENS
<br />4
<br />FOR ADDITIONAL INFORMATION SEE DETAILS GLASS GOLD EXTERIOR SHEATHING
<br />4
<br />FOR ADDITIONAL INFORMATION SEE DETAILS
<br />LATH 0/ W.R.B.
<br />OETAL LATH 0/ W.R.B.
<br />3 sim
<br />FOR ADDITIONAL INFORMATION SEE DETAILS
<br />FOR ADDITIONAL INFORMATION SEE DETAILS
<br />METAL LATH 0/ W.R.B.
<br />FOR ADDITIONAL INFORMATION SEE
<br />SETTING SEALANT 0/JAMB S.A.F.
<br />DETAILS
<br />ROUGH PEN I ING WIDTH'
<br />EXTERIOR DOOR
<br />221-HR
<br />EXTERIOR DOOR
<br />18RECESSED
<br />DOOR
<br />14
<br />DOOR
<br />10
<br />MULLION DOOR -WIND W
<br />6
<br />102-HR
<br />OUTSWING DOOR
<br />DOOR
<br />DOOR
<br />I
<br />S P3
<br />II �P ACE DO R
<br />DOOR FRAME WITH INTEGRAL STOP
<br />DOOR FRAME WITH INTEGRAL STOP
<br />DOOR FRAME WITH INTEGRAL STOP
<br />III
<br />FACE OF WALL BEYOND
<br />FACE OF WALL BEYOND
<br />FACE OF WALL BEYOND
<br />STEP02
<br />INTERIOR FINISH FLOOR
<br />INTERIOR FINISH FLOOR
<br />INTERIOR FINISH FLOOR
<br />I
<br />!', FLASHING PAN
<br />FLOORING UP TO 1/4' THICK
<br />i
<br />�TTACH FLASHING PAf�
<br />THRESHOLD STOP, "PEMKO" 1842DS
<br />DOOR BOTTOM "PEMKO" 345D OR
<br />DOOR BOTTOM "PEMKO' 345D OR
<br />I
<br />AT VERTICAL SIDES ONL �k
<br />4"
<br />OR APPROVED EQUAL SET IN
<br />APPROVED EQUAL
<br />APPROVED EQUAL
<br />LAP
<br />CONTINUOUS BEAD OR SEALANT
<br />I
<br />TYP
<br />*
<br />F. F. I
<br />J_
<br />-----------
<br />---------------------
<br />W
<br />N
<br />—
<br />W
<br />CO
<br />co
<br />DOOR BOTTOM "PEMKO" 3452DV OR
<br />n
<br />Ol- 00
<br />�
<br />APPROVED EQUAL, SEAL TO DOOR
<br />1111�
<br />00 2
<br />O
<br />>
<br />X o m
<br />Q Q
<br />"PEMKO" 282D 1/4" ELEVATOR
<br />X
<br />Q IMPERVIOUS SURFACE
<br />>
<br />X
<br />Q
<br />00
<br />o °°
<br />>
<br />Q
<br />IMPERVIOUS SURFACE
<br />AD 55
<br />J
<br />o m
<br />�� * IMPERVIOUS SURFACE AD 55
<br />LAP
<br />TYP B
<br />STEP02 PAN FLASHING* - SOLDER ALL JOINTS.
<br />cn O
<br />AD 55
<br />O
<br />WHEN "L" FLASHING HAS LESS THAN A 2"
<br />*
<br />O
<br />*
<br />iv SLOPE PER PLAN
<br />*
<br />o
<br />SLOPE PER PLAN
<br />"
<br />o
<br />"
<br />VERTICAL RISE BETWEEN THE DECK AND
<br />o
<br />X
<br />iv
<br />PAN, CONSTRUCT PAN AND "L" FLASHING
<br />AS INTEGRAL ONE PIECE. COORDINATE
<br />N z X
<br />N
<br />W
<br />PAN DEPTH AND LIP HEIGHT WITH EACH
<br />SPECIFIC THRESHOLD, FABRICATE PAN
<br />N
<br />j
<br />411 TO MAXIMIZE DEPTH YET ELIMINATE
<br />�q THRESHOLD ANCHOR PENETRATIONS
<br />THROUGH THE PAN.
<br />THRESHOLD PAN SET IN
<br />STEP@ "L" FLASHING*
<br />THRESHOLD PAN SET IN
<br />CONTINUOUS BEADS OF
<br />THRESHOLD PAN SET IN
<br />CONTINUOUS BEADS OF
<br />SEALANT
<br />CONTINUOUS BEADS OF
<br />411
<br />G'yo
<br />SEALANT
<br />SEALANT
<br />"PEMKO" 158D OFFSET SADDLE SET IN
<br />A
<br />"PEMKO" 274D SADDLE SET IN
<br />SEALANT PER MANUFACTURER
<br />"PEMKO" 158D OFFSET SADDLE SET
<br />SEALANT PER MANUFACTURER
<br />3 THRESHOLD ANCHORS, DO NOT
<br />IN SEALANT PER MANUFACTURER
<br />\
<br />PENETRATE FLASHING FLASHING PAN
<br />d
<br />3 THRESHOLD ANCHORS, DO NOT
<br />3 THRESHOLD ANCHORS, DO NOT
<br />PENETRATE FLASHING PAN
<br />"PEMKO" 183D 1/4" ELEVATOR
<br />PENETRATE FLASHING PAN
<br />p��1P 1pl,
<br />ES
<br />-
<br />23
<br />-
<br />1 9
<br />00 fHH
<br />T
<br />DOOR
<br />DOOR
<br />T�
<br />DOOR FRAME WITH INTEGRAL STOP
<br />DOOR FRAME WITH INTEGRAL STOP
<br />SECTION BB III
<br />FACE OF WALL BEYOND
<br />FACE OF WALL BEYOND
<br />* COAT GSM "L" AND PAN FLASHING WITH PROTECTIVE MEMBRANE AT
<br />INTERIOR FINISH FLOOR
<br />INTERIOR FINISH FLOOR
<br />WOOD DECKS PER DETAIL 8/AD-55
<br />FLOORING UP TO 1/4" THICK
<br />FLOORING UP TO 1/4" THICK
<br />DOOR BOTTOM "PEMKO" 345D OR
<br />DOOR BOTTOM "PEMKO" 345D OR
<br />DOOR FLASHING PAN INSTALLATION
<br />3
<br />APPROVED EQUAL, SEAL TO DOOR
<br />APPROVED EQUAL, SEAL TO DOOR
<br />W.R.B. WEATHER RESISTIVE BARRIER (W.R.B.), TWO -PLY WEATHER TEX BY FORTIFIBER
<br />*
<br />BUILDING SYSTEMS GROUP. SUPER JUMBO TEX 60 MINUTE BUILDING PAPER OVER
<br />w
<br />W
<br />WEATHERSMART HOUSE WRAP.
<br />S.A.F. SELF ADHESIVE, HEALING FLASHING (S.A.F.) 12" WIDE (U.N.O.) 25 MIL (U.N.O.)
<br />0 g
<br />O 2
<br />THRESHOLD STOP, "PEMKO" 1842DS
<br />_ _ _ _ FORTIFIBER FORTIFLASH OR APPROVED EQUAL. ADHERE S.A.F. TO CLEAN, DUST
<br />W
<br />W O
<br />W
<br />0
<br />OR APPROVED EQUAL SET IN
<br />FREE BACKING USING CHEMICALLY COMPATIBLE MATERIALS AND/OR PRIMERS.
<br />o
<br />>
<br />�
<br />CONTINUOUS BEAD OR SEALANT
<br />PROVIDE SOLID WOOD BACKING OR SHEATHING BEHIND ALL AREAS TO RECEIVE
<br />x>
<br />Q
<br />Q 00
<br />HARDSCAPE
<br />Qco
<br />FINISH
<br />SELF ADHESIVE, HEALING FLASHING.
<br />*
<br />0
<br />co O
<br />N
<br />� O
<br />-
<br />FLASHING MULTI -LAYERED COMPOSITE POLYOLEFIN FLASHING 12" WIDE (U.N.O.)
<br />x
<br />SLOPE PER PLAN
<br />�0 0
<br />I
<br />FORTIFIBER MOISTOP NEXT OR APPROVED EQUAL
<br />I I
<br />GSM FLASHING GSM FLASHING METAL SHALL BE SHOP FABRICATED USING A MINIMUM 26 GA.
<br />N z
<br />a
<br />d
<br />a I I
<br />d
<br />BONDERIZED GALVANIZED SHEET METAL WITH SOLDERED JOINTS U.N.O.. STUCCO
<br />_N
<br />I
<br />°
<br />"PEMKO" 158D OFFSET SADDLE SET
<br />° a
<br />a
<br />°°
<br />° °
<br />ACCESSORIES SHALL BE CEMCO WATER MANAGEMENT SERIES, 25 GA. MATERIAL
<br />7t
<br />a a°
<br />I
<br />a
<br />a IN SEALANT PER MANUFACTURER
<br />a
<br />a
<br />PEMKO„ SADDLE SET IN SEALANT
<br />WITH A G-90 GALVANIZED COATING OR ARCHITECT APPROVED EQUAL, UNLESS
<br />d
<br />° °
<br />I I
<br />° PER MANUFACTURER
<br />NOTED OTHERWISE.
<br />a° a
<br />THRESHOLD PAN SET IN CONTINUOUS
<br />°
<br />a a
<br />BEADS OF SEALANT
<br />a
<br />a a
<br />CORNER FLASH CORNER FLASHING MEMBRANE WITH A RUBBERIZED ASPHALT CORE
<br />d41
<br />TLS LABS. GS 100 SERIES OR APPROVED EQUAL
<br />Q
<br />J ° _
<br />"PEMKO" 183D 1/4" ELEVATOR
<br />4a
<br />BOND BREAKER POLYETHYLENE TAPE TO BE USED AS BOND BREAKER, REQUIRED BETWEEN
<br />CONCRETE ANCHOR, PROVIDE
<br />CONCRETE ANCHOR, PROVIDE
<br />ACRYLIC PLASTER AND PAINT FINISHES AND ALL WEEPING SOLID LEG FLASHING.
<br />INTERIOR
<br />° EXTERIOR
<br />THREE ANCHORS MINIMUM
<br />INTERIOR
<br />CORRIDOR THREE ANCHORS MINIMUM
<br />TAPE SHOULD RUN FROM THE SOLID VERTICAL LEG TO 1/8" FROM FRONT EDGE.
<br />ANY APPLIED FINISH THAT CREATES A BOND BETWEEN THE PLASTER AND METAL
<br />SHALL BE BROKEN WITH UTILITY KNIFE AND SHALL BE MAINTAINED AS SUCH.
<br />SEALANT ® POLYURETHANE SEALANT FORTIFIBER MOISTOP SEALANT OR APPROVED EQUAL.
<br />AT A MINIMUM, EXPOSED SEALANT SHALL BE CHECKED ANNUALLY AND
<br />MAINTAINED PER MANUFACTURERS RECOMMENDATION TO MAINTAIN A WATER
<br />TIGHT SEAL.
<br />FOR ADDITIONAL INFORMATION SEE DETAILS
<br />4
<br />D
<br />FOR ADDITIONAL INFORMATION SEE
<br />DETAILS 3 4
<br />NOTE: CAULK ENDS OF THRESHOLDS, AND UNDER FULL LENGTH OF LEGS TO DOOR
<br />FLASHING PAN TO MAINTAIN WATER TIGHT INSTALLATION.
<br />-
<br />24
<br />-
<br />20
<br />UNIT DOOR @
<br />BALCONY/ DECK
<br />16
<br />UNIT DOOR @
<br />BALCONY/DECK
<br />12
<br />UNIT PRIMARY
<br />DOOR @ INT. CORRIDOR
<br />8
<br />NOTES
<br />4
<br />Architecture + Planning
<br />17911 Von Karman Ave.
<br />Suite 200
<br />Irvine, CA 92614
<br />ktgy.com
<br />949.851.2133
<br />KTGY Project No: 2017-0934
<br />Project Contact: Debbie Holland
<br />Email: dholland@ktgy.com
<br />Principal: Wil Wong
<br />Project Designer: D. Schoolmeester
<br />Project Director: Debbie Holland
<br />Developer
<br />E I] Q A K
<br />INVESTMENTS
<br />4199 CAMPUS DRIVE
<br />IRVINE, CA 92612
<br />PHONE NO. (714) 342-2502
<br />1
<br />TF
<br />i
<br />r
<br />C)
<br />N
<br />Q
<br />U
<br />Q
<br />z
<br />Q
<br />Q
<br />z
<br />Q
<br />U)
<br />w
<br />w
<br />U)
<br />F_
<br />ICT
<br />LO
<br />r
<br />L0
<br />015
<br />Nt
<br />No. Date Description
<br />It is the clients responsibility prior to or during construction to notify the architect in writing
<br />of any perceived errors or omissions in the plans and specifications of which a contractor
<br />thoroughly knowledgeable with the building codes and methods of construction should
<br />reasonably be aware. Written instructions addressing such perceived errors or omissions
<br />shall be received from the architect prior to the client or clients subcontractors proceeding
<br />with the work. The client will be responsible for any defects in construction if these
<br />procedures are not followed.
<br />��SED ARCh,�T
<br />,A
<br />No. C29795
<br />RENEWAL DATE
<br />AUGUST 31, 2023
<br />s�gTF
<br />OF C A�
<br />License Stamp
<br />EXTERIOR DOOR
<br />FLASHING DETAILS AT
<br />STUCCO
<br />AD-5200
<br />Z
<br />^J
<br />L.L
<br />r
<br />I-n
<br />V
<br />ILL
<br />N
<br />N
<br />C)
<br />N
<br />r
<br />C)
<br />00
<br />O
<br />COPYRIGHT U
<br />
|