Laserfiche WebLink
ROOF FRAMING AND SHEATHING PER <br />STRUCT. DRAWINGS, FRAMING AND S�pP�� ROOF SIDE - TOP OF PARAPET PER E ROOF SIDE TOP OF PARAPET PER <br />PLYWOOD SUBSTRATE TO SLOPE AS 1' EXTERIOR ELEVATIONS EXTERIOR ELEVATIONS <br />SHOWN ON ARCHITECTURAL ROOF 1 1 TPO ROOFING, UP BACK OF 3 3 <br />PLAN (1/4": V-0" MINIMUM LOW PARAPET WALL AND 2 GSM "COPING" FLASHING <br />- C <br />-EXTERIOR CEMENT PLASTER <br />ONTO TOP OF WALL. SEE • <br />DETAIL <br />I <br />C 1x PLASTER STOP 0/ FLASHING <br />CONTINUOUS 1/2" BEAD OF SEALANT 0/ W.R.B. <br />ALL FOUR SIDES OF GSM "COLLAR" <br />I <br />FLASHING <br />SCUPPER OPENING 2 SPECIFIED TPO ROOFING SYSTEM <br />W.R.B. Architecture + Planning <br />�I I <br />V 17911 Von Karman Ave. <br />GSM CONDUCTOR HEAD, PRIME AND l _(3 )GSM "INSIDE CORNER" FLASHING, LAP <br />PAINT ROOF SIDE ROOFING AS DETAILED AND EXTEND Suite 200 <br />el 6 2 TO TOP OF LOW PARAPET WALL <br />I Irvine, CA 92614 <br />INSERT CONDUCTOR HEAD INTO — METAL PANEL -INSTALL PER ktgy.COm <br />DRAIN LEADER � _ �\ \ PARAPET FLASHING ASSEMBLY PART I MANUF. GUIDELINES <br />949.851.2133 <br />2x SOLID BACKING REQUIRED — I <br />4 TPO ROOFING 0/ GSM "INSIDE KTGY Project N o : 201 7-0934 <br />CORNER" FLASHING AND TPO <br />GSM DRAIN LEADER SUPPORT BAND L= ROOFING SYSTEM <br />PROVIDE AT FLOOR LINE AND AT Project Contact: <br />5 FLASHING, 2" MIN. LAP 0/ ROOFING Debbie Holland <br />MID -FLOOR TYPICAL, 6' 0" O.C. MAX. CAP SHEET Email: dholland@ktgy.com <br />ATTACH BAND WITH STAINLESS STEEL ,t gy,com <br />SCREW WITH WATERTIGHT WASHER; <br />PRE -DRILL AND FILL HOLE WITH CAULK <br />1, <br />Principal: Wil Wong <br />GSM DRAIN LEADER, PRIME AND Project Designer: D. Schoolmeester <br />PAINT. SIZE AS INDICATED PER PLAN. <br />SPECIFIED TPO ROOFING SYSTEM <br />Project Director: Debbie Holland <br />I I I <br />TPO COVER STRIP <br />I I <br />Developer <br />SCUPPE WIDTH <br />PER ILAN GSM "SCUPPER AND OVERFLOW" <br />FLASHING, SET IN PLY OF SEALING <br />SCUPPER OPENING MASTIC SPECIFIED T.P.O. ROOFING SYSTEM <br />1 MECH. FASTENER SPACING AND E A <br />LINE OF WALL FINISH TOP OF SCUPPER II\ VES <br />2" HIGH OVERFLOW ALIGNED WITH ATTACHMENT PER MANUF. <br />`I MEN"1 S <br />GSM "SCUPPER AND OVERFLOW" ROOF SIDE EXTERIOR <br />SIDE HI -TEMP S.A.F. AT FASTENERS <br />I FLASHING, ROOF SIDE PARAPET FLASHING ASSEMBLY PART II MINIMUM 5/8" EXTERIOR GRADE 4199 CAMPUS DRIVE <br />W.R.B., TUCK UNDER FLASHING 3" PLYWOOD WALL SHEATHING BEHIND <br />I MINIMUM. CONTINUE WEATHERBOARD <br />ROOFING I RV I N E CA 92612 <br />INSTALLATION ' <br />2 2 i INTEGRAL 7/8" STUCCO SCREED ALL PHONE NO. (714) 342-2502 <br />FOUR SIDES, TYPICAL ' <br />p�TN PER --­(6 )GSM "SPRING-LOK" g <br />VERIFY �� + 1" 5" FLASHING, SEE DETAIL _ <br />WIp <br />TH I <br />PLAN +RPE 41, <br />I I <br />- 7 9" WIDE S.A.F., PROVIDE SOLID <br />�o ALIGN i BLOCKING BEHIND S.A.F. IF <br />SHEATHING IS NOT REQUIRED <br />a HIGHEST POINT OF ROOF HIGHEST POINT OF ROOF <br />LEADER SIZE i I 77 SEE ROOF PLAN SEE ROOF PLAN <br />PLUS 1" I L <br />N r 8 ONE PIECE SOLDERED 12 <br />i /� GSM "SADDLE" c EXTERIOR CEMENT PLASTER 0/ WIRE <br />EQ 1/4" DRAIN EADER 1/4 EQ LEADER SIZE EQ <br />PLUS 3/8" IT MAX.) i FLASHING, SEE DETAIL <br />MINU ,/4' i � �/ LATH 0/ W.R.B. <br />I I <br />I I <br />I I <br />WALL FRAMING PER STRUCTURAL <br />DRAWINGS O <br />ROOF SIDE I` <br />5 j PENETRATION OPENING TO BE 1" PARAPET FLASHING ASSEMBLY PART III CV <br />j WIDER AND TALLER THAN THE SHEATHING MAY OCCUR <br />L _ _ _ _ L SCUPPER TO ALLOW 1/2" WIDE UJ < <br />9 GSM INTEGRAL <br />WIDTH OFSCUPPER I SEALANT JOINT ON ALL SIDES OF U <br />PL S2" I 1/4" 1/4" <br />BETWEEN SCUPPER AND COLLAR STUCCO SCREED ALL 12 <br />I <br />FLASHING THREE SIDES, SEE DETAIL ROOF FRAMING AND SHEATHING PER Q <br />STRUCTURAL DRAWINGS, FRAMING Z <br />PROVIDE 1/4" ROLLED OR ANGLED 10 1x PLASTER STOP A A AND PLYWOOD SUBSTRATE TO SLOPE Q <br />ELEVATION PROFILE STUCCO GROUND EDGE TO PERMIT \V V AS SHOWN ON ARCHITECTURAL ROOF <br />4 22 SCUPPER AND OVERFLOW GSM "COLLAR" FLASHING, PLASTER TO KEY UNDERNEATH THE 4 4 PLAN (1/4": 1' 0" MINIMUM) <br />FOR ADDITIONAL INFORMATION SEE DETAIL EXTERIOR SIDE AWAY FROM ROOF EDGE ,\ FOR ADDITIONAL INFORMATION SEE DETAIL FOR ADDITIONAL INFORMATION SEE DETAIL z <br />O() <br />CONDUCTOR HEAD & DOWNSPOUT 22 GSM SCUPPER & OVERFLOW 14 PARAPET FLASHING, MTL. PANEL 6 PARAPET FLASHING, CAP SHEET 2 <br />w <br />/ METAL STRAP WITH SCREWS 8" MIN. (TYP.) ROOF SIDE FACE OF PARAPET OR NOTES: / ao� GSM COPING FLASHING NOTES w <br />ATTACHED TO ALLOW FOR �% CURB WHERE OCCURS 1. SEE PLUMBING DOCUMENTS FOR 11 GSM "COPING" FLASHING JQ �P��S 1. GSM "ROOF" FLASHING SHALL BE <br />MOVEMENT OF PIPING SPECIFIED ROOF AND OVERFLOW EXTEND BACK TO GSM FABRICATED FROM G90 COATED ® DRAINS, DRAIN LEADERS AND "SADDLE" FLASHING, Q'oJ�� STEEL. Q <br />ADDITIONAL INFORMATION NOT SEE DETAIL �' i 2. ALL FLASHING SEAMS, LAPS AND U) <br />PIPE OR CONDUIT SHOWN HERE. ROOF SIDE i JOINTS SHALL BE SEALED. z <br />2. STEEL FLASHING CLAMP AND UNDER 3. CORNER COPINGS SHALL BE SHOP <br />- DECK CLAMP SHALL BE USED ON ALL PARAPET FLASHING ASSEMBLY PART IV FABRICATED AND SOLDERED <br />— q , , ROOF AND OVERFLOW DRAINS. i WATERTIGHT. <br />3. ROOFING MEMBRANE SHALL BE T 4. PROVIDE CONTINUOUS WOOD uJ EXTENDED UNDER STEEL FLASHING EXTERIOR CEMENT PLASTER 0/ WIRE .o <br />� o-- �1 J/ �0IN S BACKING THAT IS SLOPED 1": 1'-0" TO <br />LATH 0/ W.R.B. �'`�9 '�! `� �O N R � LO <br />CLAMP. , B��o GsP� SIO ATE THE ROOF SIDE. <br />o O O O O O O O O _ 4. OVERFLOW DRAIN SHALL BE FITTED 9�� oq� PP� o GE 5. EXTEND THE TPO ROOFING UP OVER <br />Fv 0 O O o �� 20� E� I0'0 THE TOP OF THE WALL UNDER METAL <br />LO <br />4x4 MINIMUM REDWOOD BLOCKING 1 O 0 0 O � 1 O 0 0 O � WITH 2" HIGH SOLID WATER DAM. T <br />O 0�� O O 0�� O 5. WHEN ROOFING INSTALLATION IS i � ��T P COPING, TYP. �S <br />6. ON THE ROOF SIDE, COPINGS ARE <br />SPACED AT 6'-0" O.C. -FIELD VERIFY \ Oa �� � COMPLETE, CONTRACTOR SHALL � \ � �coq FASTENED THROUGH OVERSIZED OR <br />(2) DABS OF ROOF CEMENT PLACED \ �00� \ �00r INSPECT AND TEST ALL ROOF DRAINS i 'moo '� LO <br />BETWEEN BLOCK AND PAD o _ _ i _ _ i TO ASSURE THAT DRAINAGE SYSTEM CORNER COPING LAP BUTT JOINT SLOTTED HOLES. V_ <br />yy� (SPECIFIED) WALK PAD AT PIPES OR IS NOT CLOGGED. � � � SOLDER MITERED CORNERS 7. ON THE SIDE AWAY FROM THE ROOF, <br />CONDUIT UP TO 1" DIAMETER OR 1/2" \ WATERTIGHT CLEATS FASTENED AT 18" O.C. WITH <br />THICK RUBBER WALK PADS AS CORROSION RESISTANT FASTENERS. <br />DISTRIBUTED BY THE MEADOWS CO. 8. FASTENERS ARE NOT ALLOWED AT <br />oe- 9 & 10 PER GSM "COPING" FLASHING SLOPING HORIZONTAL SURFACES. <br />AT PIPES AND CONDUITS GREATER P�a`�5 9. USE BUTT JOINT WITH BACKUP PLATE <br />1'-0" 2'-0" 1'-0" � ` <br />THAN 1" DIAMETER. 2" HIGH SOLID WATER DAM AT JQ �' " <br />4'-0" OVERFLOW DRAIN ,� �' � B-Q AT COPING WIDTHS UP TO 18 . SEE <br />PLAN i ,I `aP J� i ROOF SIDE VERIFY WALL WIDTH SIDE AWAY FROM SMACNA TABLE 3-1, JOINT J2 <br />UNI-STRUT LAP ROOF MEMBRANE UNDER <br />i SLOPE TOP OF THE ROOF 10. USE BUTT JOINT WITH COVER AND <br />CLAMPING RING, TYPICAL COPING AT BACKUP PLATES AT COPING WIDTHS <br />i 1": V-0" MINIMUM <br />OVER 18". SEE SMACNA TABLE 3-1, <br />SPECIFIED TPO ROOFING JOINT J5. <br />_ SYSTEM ROOF SIDE EXTERIOR SIDE \ i / 0 v. 1/Z 0���$ cCIOw �� \ 7 22 GA. GSM CLEAT <br />R 3�a.J <br />/ 4x �(P PP0�310 ATE M — & O5 WOOD BACKING <br />PARAPET FLASHING COMPLETED ASSEMBLY E0, <br />__(6 )STAINLESS STEEL SCREW WITH <br />ROOF SHEATHING AND TRUSS PER NOTE: 3/8" 3/8" WATERTIGHT WASHER AT 24" O.C. No. Date Description Iff— <br />STRUCTURAL DRAWINGS LAP ALL FLASHING AND THE WATER RESISTANT BARRIER IN WEATHERBOARD FASHION. COPING LAP BUTT JOINT GSM "COPING" FLASHING; USE 22 GA. <br />2 4 6 TO 12" COPING WIDTH, 20 GA. OVER M <br />NOTE: 2x SUPPORT FRAMING AT ROOF DRAIN FOR ADDITIONAL INFORMATION SEE DETAIL 12" COPING WIDTH. SEE FLASHING W <br />1. NO FASTENERS SHALL PENETRATE THE ROOFING MEMBRANE. SECTION PRIMARY ROOF DRAIN ROOF OVERFLOW DRAIN DEPRESSION NOTES ABOVE. <br />PIPE CONDUIT SUPPORT 23 ROOF DRAIN & OVERFLOW 15 LOW PARAPET FLASHING HIGH PARAPET WALL 11 GSM COPING FLASHING 3 U) <br />@ �e <br />1-HR RATED WALL PER PLAN I U <br />� PROVIDE 1/4" ROLLED OR ANGLED <br />FRAMING PER STRUCTURAL HOLLOW METAL DOOR PER DOOR ' VERIFY EQUIPMENT SIZE AND COPING STUCCO GROUND EDGE TO PERMIT W <br />SCHEDULE t __--------VERIFY <br />REQUIRED CLEARANCES WITH WIDTH + 3/4" PLASTER TO KEY UNDERNEATH THE I <br />PAINTED GSM STATIC AURA TYPE 2x SOLID BACKING REQUIRED AT S.A.F. i HOLLOW METAL DOOR FRAME ALL EQUIPMENT MANUFACTURER, EDGE U <br />ATTIC VENT, SIZES AND LOCATIONS WHEN SHEATHING NOT PROVIDED ® \ i EQUIPMENT PER M.P.E. PLANS <br />AS SHOWN ON THE ROOF PLAN 4 SIDES PER DOOR SCHEDULE ® � � CEMCO # 66 EXPANDED FLANGE 7 <br />SHEATHING MAY OCCUR DOOR SEAL "PEMKO" S88D ALL 4 \ Y / MASON INDUSTRIES TYPE SR SPRING oo CASING BEAD Lz <br />CORROSION RESISTANT SHEET SIDES, OR APPROVED EQUAL co N <br />METAL SCREW, SEAL WATER TIGHT 2 HOLLOW METAL DOOR FRAME DOOR BOTTOM "PEMKO" 3452DV OR \ -�'_ J ISOLATOR HAVING 1" OF STATIC U) N J <br />IN PER DOOR SCHEDULE -;� DEFLECTION. VERIFY QUANTITY AND W It is the clients responsibility prior to or during construction to notify the architect in writing <br />APPROVED EQUAL, SEAL TO DOOR \== PLACEMENT REQUIRED. SET IN A BED <br />of any perceived errors or omissions in the plans and specifications of which a contractor <br />GSM "CURB" FLASHING MOUNTED "r OF SEALANT. Q 7/8" thoroughly knowledgeable with the building codes and methods of construction should <br />METAL DOOR FRAME 4 SIDES �,�,; <br />\ �� / -7-r J �� �� reasonably be aware. Written instructions addressing such perceived errors or omissions <br />GSM COPING FLASHING �^ <br />FLASHING FLANGE WITH DRIP, shall be received from the architect prior to the client or clients subcontractors proceeding v, <br />PAINTED. THRESHOLD PAN SET �� �� �= ;; _ 22 GA. GSM "CAP" FLASHING, ALL with the work. The client will be responsible for any defects in construction if these <br />IN CONTINUOUS BED SEAMS SHALL BE FLAT LOCK LENGTH OF ROOF SIDE LEG SHALL procedures are not followed. <br />STAINLESS STEEL SCREW WITH I OF ROOF CEMENT - EXTEND DOWN TO GSM "SPRING-LOK" <br />WATERTIGHT WASHER AT 12" O.C. SOLDERED 0/ ROOFING MEMBRANE FLASHING <br />LAP BASE AND CAP SHEET SWEAT SHEET 0/ PLYWOOD �\ USED ARC, ,l U_ <br />MINIMUM TWO PER SIDE 3" MIN. ONTO SILL PLATE w a GSM "SPRING-LOK" FLASHING <br />2x8 P.T. CURB ALL AROUND. I ° ° 'ofGSM INTEGRAL STUCCO SCREED �uR %?�O <br />o <br />a e ° ° m 2x PLATFORM FRAMING AND N <br />ZO <br />CONNECTIONS TO SUPPORTS BELOW „ N <br />WALKING PAD m I N PER STRUCTURAL PLANS 6 No. C29795 <br />0g RENEWAL DATE (V <br />\ w �ERIF� i / AUGUST 31, 2023 <br />SPECIFIED T.P.O. ROOFING SYSTEM c�� ° < SPECIFIED T.P.O. SYSTEM SOLID BLOCKING OR SHEATHING �'9/ <br />DOOR SEAL "PEMKO" S88D OR REQUIRED BEHIND 1" MINIMUM AND F �F CAll- <br />APPROVED EQUAL BEYOND COPING FLANGE. <br />0. <br />z0 T.P.O. ROOFING INSTALL PER MANUF. ��- <br />WRAP S.A.F. INTO JAMB AND DOWN 0/ a? ��'Pi License tamp Ip <br />REQUIREMENTS. RUN UP AND OVER <br />DOOR FLASHING PAN AND "L" METAL No CURB <br />FLAT STOCK <br />HOLLOWMEFLASHING <br />LDOOR, THRESHOLD �� J TPO ROOFING DETAILS <br />ROOF FRAMING AND SHEATHING PER JAMB ON HOLLOW METAL DOOR, TYP. ``� � � <br />STRUCTURAL DRAWINGS, FRAMING <br />BACKER ROD &SEALANT <br />AND PLYWOOD SUBSTRATE TO SLOPE <br />ROOF SHEATHING moo SLOPE TO MATCH 3 <br />AS SHOWN ON ARCHITECTURAL ROOF W.R.B. 0/ 4" J-SERIES CASING BEADFRAMING, BLOCKING, ROOF TRUSS GSM "COPING" FLASHING, <br />PLAN (1/4": V-0" MINIMUM) 0/ S.A.F. ROOF TRUSSES BY OTHERS woe ��� J <br />3 COAT STUCCO SYSTEM 0/ METAL Sao AND SHEATHING PER STRUCTURAL a i SEE DETAIL <br />STAIR LANDING FRAMING PER CRICKET REQUIRED AT HIGH 16 PLANS 6" 2x SOLID BLOCK BETWEEN TRUSS LATH 0/ W.R.B. STRUCTURAL SIDE OF ROOF PLATFORM IF V <br />TOP CHORD, BLOCK ALL AROUND WIDTH IS GREATER THAN 30" <br />FOR ADDITIONAL INFORMATION SEE DETAIL 4 JAMB FIRE BARRIER AT EXIT ENCLOSURE - <br />SEE PLAN FOR FIRE RATING VERIFY AND COORDINATE ALL BUILT-UP ROOFING DETAILS WITH MANUFACTURER AND INSTALL IN CONFORMANCE WITH MANUFACTURERS REQUIREMENTS FOR WARRANTY SPECIFIED GSM "SADDLE" FLASHING BLOCKING <br />ATTIC VENT 24 DOOR AT ROOF 16 MECHANICAL PLATFORM 8 GSM "SADDLE" FLASHING & INTEGRAL STUCCO SCREED 4 AD-61 <br />COPYRIGHT n <br />