My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 16 - Agreements for A -Tech Consulting, Inc., Dudek, and Leighton Consulting, Inc. for On -Call Various Environmental Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
10/18/2022 Special and Regular
>
Item 16 - Agreements for A -Tech Consulting, Inc., Dudek, and Leighton Consulting, Inc. for On -Call Various Environmental Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2024 11:32:45 AM
Creation date
8/14/2023 11:51:16 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
16
Date
10/18/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DUDEK <br />California law requires submittal of a California Department of Public Health Form 8552 to the state <br />following lead inspection activities in public or commercial buildings. As such, Aurora will submit the <br />Form 8552 to the state, with a copy submitted to the City. The findings of the survey, whether it be <br />visual or include laboratory analysis, will be presented in a standalone report or incorporated into a <br />Phase I or II ESA report. <br />Aurora has also supported Dudek projects with the preparation of abatement specifications for <br />construction bids and monitoring during demolition/renovation <br />Table 3. Project Timeline <br />Phase I ESA Database Search, Site Reconnaissance, 2 weeks <br />Agency Interviews, Historic Records <br />Review <br />Report Preparation and Submittal 2 weeks <br />Phase 11 ESA Work Plan Preparation, Commission 2 weeks <br />Review, Health and Safety Plan <br />Preparation <br />Field Activities and Data Evaluation 2-4 weeks <br />Commission Review 1 week <br />Report Submittal 1 week <br />Hazardous Materials Building Survey and Sampling 1 week <br />Surveys <br />Report Preparation and Submittal 3 weeks <br />Various Environmental Services 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.