My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 16 - Agreements for A -Tech Consulting, Inc., Dudek, and Leighton Consulting, Inc. for On -Call Various Environmental Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
10/18/2022 Special and Regular
>
Item 16 - Agreements for A -Tech Consulting, Inc., Dudek, and Leighton Consulting, Inc. for On -Call Various Environmental Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2024 11:32:45 AM
Creation date
8/14/2023 11:51:16 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
16
Date
10/18/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DUDEK <br />Evaluation of Soil and Soil Vapor Data <br />Dudek will evaluate the results of the soil vapor sampling data and conduct a screening level risk <br />assessment using California Regional Water Quality Control Board Environmental Screening Levels, <br />EPA Regional Screening Levels, and DTSC HERO Note 3 Screening Levels. <br />If risks exceed those allowable for the target land use criteria, additional sampling may be necessary <br />and/or a formal human health risk assessment (HHRA) may be recommended. <br />The findings of the limited Phase II ESA will be presented in a letter report that will include a summary <br />of the work performed, any variances from the work plan, tabulated data, figures depicting the sample <br />locations and areas of concern, soil boring logs, and laboratory analytical results. If the findings of the <br />limited Phase II ESA report indicate a potential impact of vapor migration or other potential impacts on <br />the site, the report will also contain recommendations for further work. Recommendations may include <br />remediation, vapor mitigation design, or other investigations to appropriately determine the nature and <br />extent of any contamination. <br />Project Cost <br />Table 2 presents the cost for the aforementioned scope of work. <br />Table 2. Phase II ESA Project Cost <br />Dudek Labor $8,300 <br />Subcontractor Costs $7,900 <br />Other Direct Costs (permit fee, mileage for site visit, air $652 <br />monitoring equipment) <br />Total 1 $16,852 <br />Various Environmental Services Sample Project Budgets 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.