My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 16 - Agreements for A -Tech Consulting, Inc., Dudek, and Leighton Consulting, Inc. for On -Call Various Environmental Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
10/18/2022 Special and Regular
>
Item 16 - Agreements for A -Tech Consulting, Inc., Dudek, and Leighton Consulting, Inc. for On -Call Various Environmental Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2024 11:32:45 AM
Creation date
8/14/2023 11:51:16 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
16
Date
10/18/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DUDEK <br />Category I and II Joint Relevant Project Experience <br />Client: San Diego State University <br />Project Location: City of San Diego <br />Project Dates: 2018-2020 <br />Client Reference- Michael P. Masterson, Gatzke Dillon Balance, mmasterson@gdandb.com <br />760.431.9501 <br />Key Personnel: Glenna McMahon, Audrey Herschberger <br />Dudek completed work for the San Diego State University (SDSU) Mission Valley Campus Master Plan, <br />which included preparation of the CEQA hazards and hazardous materials evaluation and demolition of <br />Qualcomm Stadium for future construction of a new stadium, student housing, campus/office buildings, <br />a park, and trolley transit center. The hazards and hazardous materials impact analysis was <br />multifaceted and included the following: <br />■ Evaluation of regulatory records for on -site and surrounding hazardous material releases <br />■ Review of the use of explosives for demolition of the existing stadium <br />■ Review and analysis of a release and cleanup action occurring on the project site due to the <br />adjoining Kinder Morgan Mission Valley Terminal (MVT) <br />■ Analysis of potential impacts associated with MVT petroleum pipelines transecting the project <br />site. Mitigation required safety measures and cooperation with Kinder Morgan <br />■ Review and analysis of the active Cleanup and Abatement Order issued to MVT which required <br />monitoring wells to remain on the project site in active working order. Mitigation required a well <br />decommissioning/protection plan <br />■ Analysis of potential vapor intrusion due to on -site contamination and mitigation for future <br />residential site use <br />■ Coordination and management of a hazardous materials survey, which was conducted by <br />Dudek's subcontractor Aurora. <br />■ The survey was conducted based on Dudek's findings in the EIR and recommended mitigation. <br />Dudek served as project manager and provided a direct line of communication between Aurora and <br />SDSU and its contractor, reviewed the hazardous material surveys and work products, coordinated <br />on -site activities, and ensured the work completed would meet the requirements set forth in the EIR <br />mitigation. Aurora also prepared specifications for abatement of the hazardous materials <br />Various Environmental Services <br />E <br />
The URL can be used to link to this page
Your browser does not support the video tag.