My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 20 - On-Call Grant Writing Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
09/20/2022 Special and Regular
>
Item 20 - On-Call Grant Writing Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2023 2:35:31 PM
Creation date
8/14/2023 2:34:25 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
20
Date
9/20/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5SECTION 2. FIRM AND TEAM EXPERIENCE <br />Key Staffing Summary <br />Greg Jaquez, PE <br />Principal Project Manager/Grant Writing Manager <br />For this contract, Greg will oversee project delivery and provide general guidance <br />on all grant writing and research tasks for the City. <br />Monica Killen, PhD <br />Senior Grant Writer <br />For this contract, Monica will be the task manager assigning grant writing and research <br />roles across the team, provide an initial level of quality control oversight, and be a <br />content contributor for grant writing. <br />Beth Reineke <br />Grant Writer/Water Resources Specialist <br />For this contract, Beth will be the lead technical writer with responsibility for contributing <br />technical content and assuring technical accuracy across the entire work product. <br />Nick Panosky, PE, QSD <br />Water Resources Specialist <br />For this contract, Nick will be the advisor for water resource technical accuracy, <br />preliminary engineering scoping, and cost estimation. <br />Michael Ip, PE, QSD <br />Transportation/Traffic Engineer <br />For this contract, Michael will serve as the advisor for transportation technical accuracy, <br />preliminary engineering scoping, and cost estimation. <br />MNS believes that project management is rooted in frequent <br />communication and proactive planning. Our proposed team <br />follows this philosophy and is ready and available to serve <br />the City of Santa Ana on this contract.
The URL can be used to link to this page
Your browser does not support the video tag.