Laserfiche WebLink
BUTTER <br />Const"'Clion Managers, Consul <br />EDUCATION/ <br />TRAINING <br />Graduate of <br />IBEW/NECA Local 11 <br />Apprenticeship 1986 <br />Graduate of <br />Instrumentation I & II <br />(1989), Electrical <br />Training Institute <br />Completed Foremanship <br />Class (ETI) <br />LICENSES / <br />CERTIFICATIONS <br />Master Electrician, <br />State of Colorado <br />Contractor's License <br />(Inactive), California, <br />Arizona and Nevada <br />SOFTWARE <br />Estimating (McCormick <br />Estimating Software) <br />Project Scheduling/Cost <br />Control (Microsoft <br />Projects) <br />MS Excel, Word, <br />PowerPoint <br />AFFILIATIONS <br />Member, Occupational <br />Safety Council of <br />America (OSCA) <br />AREAS OF <br />EXPERTISE <br />Field Engineering and <br />Electrical Design <br />Electrical Inspection and <br />Specification <br />Acceptance <br />Client/Construction <br />Representative <br />Integrator of Ray -Chem <br />and Chromalox Heat <br />Trace Products <br />Bruce Phillips <br />Electrical Inspector <br />Professional Summary <br />Mr. Phillips brings over 30 years of experience in industrial and commercial <br />construction to Butier Engineering, Inc. He has focused the last 20 years of <br />his career on providing construction cost estimating, project management, <br />human resources (craft), client development and client management <br />services. His skills include a comprehensive array of experience in <br />operations, management, project management, estimating and start- <br />up/commissioning services in upstream oil and gas production, petroleum <br />refining, petro-chemical, wastewater treatment, food processing and power <br />generation. <br />Project Experience <br />Electrical Inspector, Groundwater Replenishment System Final <br />Expansion Project; Fountain Valley, CA; Orange County Water District <br />(Duration: 2019 —2023; Value: $193,977,148)— The GWRSFE is a water <br />supply project designed to provide an additional 31,000 AFY of advanced <br />treated wastewater (recycled water) to the groundwater basin in north and <br />central Orange County. The GWRSFE scope of work includes upgrading the <br />existing 100 MGD Advanced Water Purification Facility (AWPF) by adding 30 <br />MGD of additional capacity; constructing Plant No. 2 Secondary Effluent <br />Conveyance Facilities; and rehabilitating an existing pipeline between Plant <br />No. 2 and Plant No. 1 to bring secondary effluent to the GWRS. <br />Pacific Gas and Electric — EPC: Guernsey 20 MW Solar Project <br />Project Magnitude: $ 85,000,000 <br />Chevron SJBU — Cymric Lease Managed Maintenance and <br />New Construction Projects <br />Project Magnitude: $ 12,000,000 <br />Ormat Geo Thermal Project; Brawley, CA — Installation of 4 — 10 MW <br />Geothermal Steam Turbines <br />Project Magnitude: $ 3,300,000 <br />Occidental Petroleum; Clayton, NM — Installation of 2 - CO2 <br />Compressor <br />Project Magnitude: $2,800,000 <br />Tech Conveyor; Memphis, TN — Installation of 5 miles of Box Conveyor <br />Project Magnitude: $ 4,500,000 <br />Big West of California; Bakersfield, CA — Tank Gauging Project <br />Project Magnitude: $ 1,200,000 <br />