My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 37 - Construction Management and Inspection Services for Well 32 Rehabilitation
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
06/21/2022 Regular & Special HA
>
Item 37 - Construction Management and Inspection Services for Well 32 Rehabilitation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2024 12:03:42 PM
Creation date
8/15/2023 8:57:36 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
37
Date
6/21/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BIJTIER <br />ConsVucfion Managers, Gmsullinp E,,gme rs <br />Frankie Alonso <br />Inspector <br />starting at the east end of Piedmont Drive and proceeding south along the <br />western San Manuel Casino (Casino) property line. It then turns east, just <br />north of the Casino's south perimeter wall, before turning into Marshall <br />Boulevard where it reconnects with the original Foothill Pipeline. A 1,450 LF <br />section of the pipeline that ran under the Casino's front entrance was <br />relocated to an area immediately behind the Casino. The project reduces the <br />risk of damage to the pipeline from above -ground operations, including the <br />construction of a new Casino hotel by PENTA Building Group; secures the <br />safety and continues operation of the pipeline in the event of an earthquake; <br />and makes it easier for the District to monitor and maintain the pipeline as it <br />passes through tribal land. <br />Pipeline Inspector, Joint Transmission Main Unit 1, Reaches 1 and 2, 60- <br />Inch CML&C Transmission Main Relocation; Lake Forest, CA; South <br />Coast Water District (Completion: October 2012; Value $2.5 million) — <br />Mr. Alonso provided inspection services for the relocation of the 60-inch <br />PCCP transmission main from its existing location into Lake Forest from <br />Romano to Bake Parkway. The scope of work included providing construction <br />management and inspection services for the installation of approximately <br />4,100-LF of pre -purchased 60-in CML&C (welding inside and out); tie-in near <br />Romano to the tie-in location at Bake Parkway ranging in depth of cover from <br />5-ft to 17-ft; abandonment of a portion of the existing PCCP; installation of a <br />new cast -in -place isolation valve vault; installation of District pre -purchased <br />48-inch isolation valves (2); crossing and support of existing utilities; <br />repaving; excavation of rock material along a portion of the project; <br />coordination with other contractors and agencies within The Irvine Company <br />Property; coordination with contractor's QSP for SWPPP compliance; and <br />enforcement of environmental constraints. <br />Pipeline Inspector, Carlsbad 50 MGD Seawater Reverse Osmosis <br />Desalination Plant ($537 million) and 10-Mile Product Water Pipeline <br />($159 million); Carlsbad, CA; Poseidon Water (Completion: Fall 2015)— <br />Mr. Alonso provided pipeline inspection services for the Product Water <br />Pipeline portion of the Carlsbad Seawater Desalination Plant Project. Butier <br />was selected to provide Owner's Engineer services for the construction of the <br />50 MGD seawater reverse osmosis desalination plant at the Encina Power <br />Station (EPS). The scope also included the construction of a 2.5-million <br />gallon cast -in -place concrete water storage tank; product pump station; and <br />conveyance pipeline to deliver the drinking water produced by the project to <br />water utilities and municipalities in San Diego County. The 10-mile, 54-inch <br />diameter pipeline was constructed under the Interstate 5 Highway and a <br />railroad using a jack and bore tunnel method. Butier coordinated closely with <br />the City of Carlsbad, SDCWA, SDG&E, Poseidon, and the Coastal <br />Commission during the construction of the tunnel option across Macario <br />Canyon. The pipeline alignment included over 6,000 feet of tunnels <br />performed by four different tunneling subcontractors. One of the tunnels was <br />over 1,700 linear feet, 30 feet below sea level, and required a vertical shaft <br />over 80 feet in height. <br />
The URL can be used to link to this page
Your browser does not support the video tag.