My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 37 - Construction Management and Inspection Services for Well 32 Rehabilitation
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
06/21/2022 Regular & Special HA
>
Item 37 - Construction Management and Inspection Services for Well 32 Rehabilitation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2024 12:03:42 PM
Creation date
8/15/2023 8:57:36 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
37
Date
6/21/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana, Public Works Agency <br />Well 32 Rehabilitation Improvements <br />Construction Management and Inspection Services, RFP No. 22-051 <br />A. Approach to Project Control <br />Butier Engineering, Inc. understands that the City of Santa Ana is seeking a professional consultant to perform <br />construction engineering and management services for the Well 32 Rehabilitation Improvements Project. The <br />Butier Team will work as an extension of the City's staff through all phases of the project from pre -construction <br />through closeout and commissioning to ensure the work is completed in accordance with the contract <br />documents. We will use a project control system consisting of the following four elements that will provide <br />QA/QC procedures and guidelines. <br />ELEMENTS OF <br />PROJECT CONTROL <br />Butier will use a project control system <br />consisting of the following elements that <br />will provide QA/QC procedures and <br />guidelines in the successful execution of <br />the City's Well 32 project. Our team's <br />ability to manage relationships with <br />members of the Project team will also be <br />essential to minimize conflicts and keeping <br />the same goals in mind. <br />Cost Control <br />Change management <br />and pricing; force <br />account tracking and <br />estimating <br />QA/QC Control <br />Respond to RFIs; field ■ <br />documentation of site materials; <br />dairy progress reports; review as - <br />built drawings; and permits & <br />regulatory agency requirements <br />1. Cost and Schedule Controls <br />The CM Team's ability to monitor and manage the <br />Contractor's performance will be critical to <br />minimizing problems during construction and <br />potential claims. Contractor schedule requirements <br />will include substantial completion deadlines and <br />interim and final completion dates. The construction <br />progress will be evaluated based on approved, <br />resource -loaded CPM schedules (Primavera <br />P6). The Contractor will be required to submit CPM <br />schedules to the City for acceptance in addition to <br />timely, detailed status information as the work <br />progresses. The Butier Team will evaluate the <br />Contractors' actual performance by comparing <br />actual qualities completed versus planned. <br />Anticipated work to be accomplished will be <br />reviewed based on a three-week "look ahead" <br />schedule updated weekly by the Contractor. <br />Available information must be evaluated for <br />schedule exceptions, available contractual options, <br />and corrective actions required by the Contractor. <br />Schedule Control <br />Schedule Review; <br />variances addressed at <br />progress meetings; and <br />variance identification / <br />analysis initiates recovery <br />CM Manual <br />CM organization; roles and <br />responsibilities; reporting <br />relationships: communication <br />requirements: and construction <br />management procedures <br />The CM Team will address schedule variances with <br />the Contractor at weekly progress meetings. The <br />CM Team will evaluate each variance, its cause, <br />and possible corrective actions, and require the <br />Contractor to provide an action plan to correct <br />unsatisfactory variances. If a satisfactory resolution <br />is not achieved and the Contractor falls significantly <br />behind schedule, the CM Team will require the <br />Contractor to submit a recovery plan. The plan <br />should address mitigation efforts that move the <br />delayed activity off the critical path so that its <br />completion will not affect critical milestones. <br />The Butier Team will develop a QA/QC Plan that will <br />reflect a set of objectives defined by City staff and <br />assigned CM and field inspection personnel. The <br />Plan will define requirements and procedures for <br />checking, reviewing, distributing, tracking, and <br />controlling documents. The project specific QA/QC <br />Plan will be submitted and reviewed by the City <br />prior to submittal of other project deliverables. The <br />BUTLER 8 C. UNDERSTANDING OF NEED <br />
The URL can be used to link to this page
Your browser does not support the video tag.