Laserfiche WebLink
Public Works Agency <br />1. Temporary Construction Meter Deposit <br />Existing Fee: $2,096.50 <br />Proposed Fee: $3,168.00 <br /> <br />Fee updated to cover the costs for City to replace construction meter and backflow device parts due to damage or theft/lost. <br /> <br />2. Backflow Preventer 3rd and Final Notice Fee <br />Existing Fee: $117.23 <br />Proposed Fee: $190.00 <br /> <br />Fee updated to factor staffing costs. <br /> <br />3. Fire Flow Witness Fee <br /> <br />Existing Fee: $128.42 <br />Proposed Fee: $244.00 <br /> <br />Fee updated to factor staffing costs. <br /> <br />4. Install New Water Service Meter Fee 5/8” <br /> <br />Existing Fee: $125.03 <br />Proposed Fee: $465.00 <br /> <br />Fee updated to factor in AMI equipment implementation, related material and staffing costs. <br /> <br /> <br /> <br />135 of 158