My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 14 - Fiscal Year 2022-23 Miscellaneous Fee Schedule
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
06/07/2022 Regular & HA
>
Item 14 - Fiscal Year 2022-23 Miscellaneous Fee Schedule
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2023 10:14:37 AM
Creation date
8/15/2023 10:13:21 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
14
Date
6/7/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ACCOUNT UNIT ADOPTED <br />FY 21-22 FEES <br />PROPOSED <br />FY 22-23 FEES <br />DEPARTMENT <br />CHANGES <br />PLANNING & BUILDING AGENCY <br />FISCAL YEAR 2022-2023 FEE SCHEDULE <br />SECTION IX <br />MISCELLANEOUS FEE <br />127b)Residential Thermal Systems (1kwth to 10 kWth) Flat 450.00 450.00 <br />Plus each additional kWth over 10kWth Each 15.00 15.00 <br />127c)Commercial Rooftop Solar (1kW to 50kW)Flat 1,000.00 1,000.00 <br />Plus each additional kW over 50kW up to 250 kW Each 7.00 7.00 <br />Plus each additional kW over 250kW Each 5.00 5.00 <br />127d)Commercial Thermal Systems (1kWth up to 30kWth) Flat 1,000.00 1,000.00 <br />Plus each additional kWth between 30kWth up to 260kWth Each 7.00 7.00 <br />Plus each additional kWth over 260kW Each 5.00 5.00 <br />53600 128)Solar Panel - Structural Plan Check Hourly 239.34 247.72 <br />51601 129)Solar Panel - Inspection Residential Flat 352.57 364.91 <br />51601 130)Solar Panel - Inspection Commercial Flat 1,062.48 1,099.67 <br />51601 131)Field Plan Check - Subject to Field Structural Plan Check Hourly 172.65 178.69 <br />53600 132)Cell Tower - Structural Plan Check Hourly 239.34 247.72 <br />53600 133)Deferred Submittal - Structural Plan Check Hourly 239.34 247.72 <br />53600 134)Rooftop equipment - Structural Plan Check Hourly 239.34 247.72 <br />53600 135)Equipment Changeout - Structural Plan Check Hourly, min 1/2 hr 239.34 247.72 <br />53600 136)Dust Collecting - Structural Plan Check Hourly 239.34 247.72 <br />53600 137)Above/Below Ground Tank - Structural Plan Check Hourly 239.34 247.72 <br />63 of 158
The URL can be used to link to this page
Your browser does not support the video tag.