Laserfiche WebLink
ACCOUNT UNIT ADOPTED <br />FY 21-22 FEES <br />PROPOSED <br />FY 22-23 FEES <br />DEPARTMENT <br />CHANGES <br />PLANNING & BUILDING AGENCY <br />FISCAL YEAR 2022-2023 FEE SCHEDULE <br />SECTION IX <br />MISCELLANEOUS FEE <br />Electrical Fees <br />51603 165)Permit Issuance 59.30 61.38 <br />51603 166)Minimum Fee (Nonresidential)79.06 81.83 <br />53601 167)Electrical Plan Check Fee (when required)65% of Subtotal 65% of Subtotal <br />51603 168)125 Volt Receptacle Outlets 1.57 1.62 <br />51603 169)Light Switches, Occupancy Sensors 1.70 1.76 <br />51603 170)Light Fixtures 1.13 1.17 <br />51603 171)Air Conditioners, Heat Pumps 104.40 108.05 <br />51603 172)Factory-Wired Units (Solid Hook-Ups)26.71 27.64 <br />51603 173)Dedicated Circuits (15 or 20 AMP Receptacles)26.71 27.64 <br />51603 174)Time Clock, Photo-Cell, Time Switch 13.03 13.49 <br />51603 175)Track-Light, Cable Tray, Special Raceway, Plugmold, 26.71 27.64 <br /> Under-Floor Duct, Plug-In Busways, Wiremold, Etc. <br /> Service Meter, Reset Meter, Subpanel, Switchboard, Motor <br /> Control Center, Transfer Switch, Busduct, or other Distribution <br /> Equipment changes or modifications. <br />51603 176)Under 400 amperes 57.40 59.41 <br />51603 177)400 amperes to 1,199 amperes 156.51 161.99 <br />Each 100 ft. <br />or fraction thereof <br />68 of 158