Laserfiche WebLink
ACCOUNT UNIT ADOPTED <br />FY 21-22 FEES <br />PROPOSED <br />FY 22-23 FEES <br />DEPARTMENT <br />CHANGES <br />PLANNING & BUILDING AGENCY <br />FISCAL YEAR 2022-2023 FEE SCHEDULE <br />SECTION IX <br />MISCELLANEOUS FEE <br />51603 201)Temporary Electrical Service, Prior to approval or Each Meter 262.97 272.17 <br />Occupancy (30 Days) <br /> At the time of application for temporary power, the owner <br /> shall post a $1,000 cash or cashier's check conforming to the <br /> Santa Ana Municipal Code Section 8-1768 for each service <br />meter. This deposit shall be released upon request after the <br /> Certificate of Completion or Certificate of Occupancy is issued. <br />Mechanical Fees <br />51604 202)Permit Issuance Fee 59.30 61.38 <br />51604 203)Minimum Fee (Nonresidential)79.06 81.83 <br />53603 204)Stand Alone Mechanical Plan Check 65% of Subtotal 65% of Subtotal <br />Furnace including ducts & vents (each) <br />51604 205)Up to 100,000 BTU 70.66 73.13 <br />51604 206)Over 100,000 BTU 100.82 104.35 <br />51604 207)Furnace/Compressor Combo (Residential)136.71 141.49 <br />Each Compressor, Boiler or Heat Pump (packaged or split system) <br />51604 208)Up to 5 HP 97.17 100.57 <br />51604 209)Over 5 to 30 HP 116.19 120.26 <br />51604 210)Over 30 to 50 HP 145.24 150.32 <br />71 of 158