Laserfiche WebLink
ACCOUNT UNIT ADOPTED <br />FY 21-22 FEES <br />PROPOSED <br />FY 22-23 FEES <br />DEPARTMENT <br />CHANGES <br />PLANNING & BUILDING AGENCY <br />FISCAL YEAR 2022-2023 FEE SCHEDULE <br />SECTION IX <br />MISCELLANEOUS FEE <br />Absorption System <br />51604 241)Up to 1,000,000 BTU 84.34 87.29 <br />51604 242)1,000,001 to 1,750,000 BTU 119.89 124.09 <br />51604 243)1,750,001 and over 202.92 210.02 <br />51604 244)Commercial Cooking Equipment (Ovens/Fryers/Etc.)46.14 47.75 <br />51604 245)Condensate Pump 34.46 35.67 <br />51604 246)Kiln <20cubic feet (includes hood and duct) 71.16 73.65 <br />51604 247)Air Compressor (each includes piping)71.16 73.65 <br />51604 248)Cooling Tower 71.16 73.65 <br />51604 249)Heat Exchanger 65.22 67.50 <br />51604 250)Electrostatic Precipitator 42.10 43.57 <br />51604 251)Vacuum Cleaner System (Residential)71.16 73.65 <br />51604 252)Humidifier 42.16 43.64 <br />51604 253)Duct Heater 71.16 73.65 <br />51604 254)Wood Sawdust System 152.88 158.23 <br />51604 255)Incinerator (Residential)47.44 49.10 <br />74 of 158