Laserfiche WebLink
ACCOUNT UNIT ADOPTED <br />FY 21-22 FEES <br />PROPOSED <br />FY 22-23 FEES <br />DEPARTMENT <br />CHANGES <br />PLANNING & BUILDING AGENCY <br />FISCAL YEAR 2022-2023 FEE SCHEDULE <br />SECTION IX <br />MISCELLANEOUS FEE <br />ELECTRICAL PLAN CHECK FEES <br />Whenever electrical plans are required by the Building <br />Official, plan check fees shall be 65% of the electrical <br />permit fee and shall be paid at the time of submitting plans. <br />MECHANICAL PLAN CHECK FEES <br />Whenever mechanical plans are required by the Building <br />Official, plan check fees shall be 65% of the mechanical <br />permit fee and shall be paid at the time of submitting plans. <br />PLUMBING PLAN CHECK FEES <br />Whenever plumbing plans are required by the Building <br />Official, plan check fees shall be 65% of the plumbing <br />permit fee and shall be paid at the time of submitting plans. <br />GRADING PERMITS <br />51606 Any person desiring a grading permit required by the Building Each Permit 49.84 51.58 <br />Code, shall, at the time of filing an application, pay a fee of $51.58. <br />FEE SCHEDULE <br />51606 1) Grading Permit:104.26 107.91 <br /> a. One and Two S.F.D.1 Hour <br /> b. Multiple Residential including, Residential tracts,2 Hours <br /> Apartments, Condominiums, Hotels, Motels, and <br /> Similar Construction <br /> c. Non-Residential Site Less Than 2 Acres 3 Hours <br /> d. Non-Residential Site 2 Acres and More 5 Hours <br /> e. Preliminary Grading Permit, Underground Tank 1 Hour <br /> Removal and Excavation for Soil Contamination <br /> f. Existing Parking Lot Resurfacing and Repainting 1 Hour <br />Minimum Per <br />Hour <br />82 of 158