Laserfiche WebLink
PROJECT TITLE: <br />Fairview Street Improvements from <br />17th to Trask <br />PROJECT CATEGORY: <br />Street Improvements <br />Streeb8ridge Improvements & <br />Widening <br />LOCATION MAP <br />CITY OF SANTA ANA FY 22/23CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />This project will widen Fairview between 17th Street and Trask <br />Street from 2 to 3lanes in each direction. The project also includes <br />sidewalk, wheel chair ramps, raised medians, and Traffic Signal <br />modifications along Fairview Street between 17th Street and Trask <br />Street. <br />PROJECT NEED: <br />The MPAH (Master Plan ofArterial Highways) Strategic Plan Technical <br />Report identified the need for Fairview Street to be widened to a six - <br />lane major arterial to meet MPAH requirements. The existing Average <br />Daily Traffic (ADT) is in excess of 40,370 vehicles per day. The <br />proposed improvements will allow the segment to accommodate future <br />traffic volumes at a Level of Service C and increase operational <br />efficiency. <br />PROJECT COSTS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />Other 275,000 - - - - - - <br />TOTAL 275,000 - <br />SOURCE OF FUNDS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />GAS TAX 275,000 - - - - - <br />TOTAL 275,000 <br />LGENCY: DIVISION: CONTACT: <br />'ublic Works CIP Engineering Gilbert Castillo, Senior Engineer <br />21 <br />