My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 16 - Proposed Fiscal Year 2022-23 City Budget
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
06/07/2022 Regular & HA
>
Item 16 - Proposed Fiscal Year 2022-23 City Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2024 2:33:27 PM
Creation date
8/15/2023 10:18:52 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
16
Date
6/7/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1006
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TITLE: <br />Grand Avenue Roadway <br />Rehabilitation from McFadden <br />Avenue to 1st Street <br />PROJECT CATEGORY: <br />Street Improvements <br />Arterial Street Rehabilitation <br />LOCATION MAP <br />CITY OF SANTA ANA FY 22/23CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Reconstruction/resurfacing of existing pavement and <br />replacement/installation of missing or damaged, curbs, gutters, <br />sidewalks, driveway approaches, and wheelchair ramps within this <br />segment of roadway. <br />PROJECT NEED: <br />The City's Pavement Management Program (PMP) has been <br />developed to prioritize and recommend the most cost-effective roadway <br />repairs, and maximize the return from available funding for street <br />pavement. This segment of Grand Avenue pavement rehabilitation is <br />identified as a high priority in the PMP. <br />PROJECT COSTS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />Engineering 100,000 - - - - - - <br />TOTAL 100,000 <br />SOURCE OF FUNDS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />GAS TAX 100,000 - - - - - - <br />TOTAL 100,000 <br />LGENCY: DIVISION: CONTACT: <br />'ublic Works CIP Engineering Kenny Nguyen, Senior Civil Engineer <br />23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.