Laserfiche WebLink
PROJECT TITLE: <br />Traffic Signal Equipment <br />Replacement <br />PROJECT CATEGORY: <br />Traffic Improvements <br />Traffic Improvements <br />LOCATION MAP <br />r. <br />CITY OF SANTA ANA FY 22/23CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Replace outdated traffic signal and monitoring equipment, such as <br />cabinets, vehicle heads, Reflective Street Name Signs, conflict <br />monitors, controllers, CCTV, and communication equipment, both in <br />the field and in the traffic management center. <br />PROJECT NEED: <br />Much of the traffic signal, pedestrian and monitoring equipment in the <br />City is old and no longer supported by the manufacturers. This <br />equipment needs to be upgraded to maintain operations and to meet <br />current standards. <br />PROJECT COSTS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />I Construction 100,000 100,000 100,000 100,000 100,000 100,000 100,000 <br />TOTAL 100,000 100,000 100,000 100,000 100,000 100,000 100,000 <br />CITYWIDE SOURCE OF FUNDS <br />M2 LOCAL FAIRSHARE <br />TOTAL <br />AGENCY: <br />Public Works <br />DIVISION: <br />Traffic Engineering <br />FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />100,000 100,000 100,000 100,000 100,000 100,000 100,000 <br />100,000 100,000 100,000 100,000 100,000 100,000 100,000 <br />42 <br />CONTACT: <br />Cesar Rodriguez, Senior Civil Engineer <br />