Local Project Number: 21-SNTA-ICE-3995
<br />Additional Project IDs: 21-SNTA-ICE-3995
<br />Type of Work: Intersection
<br />Type of Work Description: Intersection - Add
<br />through lane(s) to intersection
<br />Limits
<br />Bristol St. north of Memory Lane
<br />Project Notes
<br />FY 22-23 CARRY FORWARD FOR ACTIVE
<br />PROJECT EXPENDITURES for MEASURE M
<br />Sept. 2021 SAR- updated ENG scheduled
<br />completion date and ROW scheduled completion
<br />date. Updated CON start and completion dates.
<br />SEPT 2021 SAR REVIEW: NO PROJECT
<br />AMENDMENT REQUESTED; SCHEDULE
<br />UPDATED: CA 09/27/21 REMINDER: Award
<br />Deadline is 06/30/22.
<br />Last Revised: 22-00 - Submitted
<br />Project Title
<br />Bristol St. and Memory Ln. Intersection Improvements
<br />Project Description
<br />Widening of the intersection at Bristol Street and Memory Lane. The proposed project would include
<br />adding a southbound through lane by replacement/installation or curbs, gutters, sidewalk, driveway
<br />approaches, pavement, landscaping, curb ramps, and a
<br />FISCAL TOTAL
<br />YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL ESCALATED
<br />2023 Intersection Capacity $0 $0 $1,012,500 $0 $1,012,500 $1,042,875
<br />Enhancements (ICE)
<br />Totals: $0 $0 $1,012,500 $0 $1,012,500 $1,042,875
<br />Total Programmed: $1,012,500�
<br />TIP ID CP-11POP
<br />IAADI 1•1kA7•RITI*IC ArFNCY
<br />Local Project Number: 20-SNTA-ACE-3968
<br />Project Title
<br />Additional Project IDs: 20-SNTA-ACE-3968
<br />Bristol Street Improvements Phase 3A - Civic Center Drive to Washington Avenue
<br />Type of Work: Road Widening
<br />Project Description
<br />Type of Work Description: Road Widening -
<br />Add Bristol Street from Civic Center Dr to Washington Ave would be widened to a total of six lanes (three
<br />2 lanes to existing roadway in project limits
<br />lanes in each direction) to be consistent with the City of Santa Ana General Plan Circulation Element
<br />and the County of Orange MPAH.
<br />Limits
<br />FISCAL TOTAL
<br />FUND TYPE ENG ROW CON/IMP O&M TOTAL
<br />YEAR ESCALATED
<br />Civic Center Drive to Washington Avenue
<br />Project Notes
<br />2023 Federal $0 $0 $793,760 $0 $793,760 $817,573
<br />CARRY FORWARD FOR ACTIVE PROJECT
<br />2023 Arterial Capacity $0 $0 $3,273,573 $0 $3,273,573 $3,371,780
<br />EXPENDITURES IN FY 22/23
<br />Enhancements (ACE)
<br />2023 Other $0 $0 $297,431 $0 $297,431 $306,354
<br />Last Revised: 22-00 - Submitted
<br />Totals: $0 $0 $4,364,764 $0 $4,364,764 $4,495,707
<br />Total Programmed: $4,364,764
<br />'^ - ^^ "" IMPI FMFAITIAIf: A(:fAlf V
<br />Local Project Number: 20-SNTA-ACE-3969 Project Title
<br />Additional Project IDs: 20-SNTA-ACE-3969 Bristol Street Improvements Phase 4 - Warner Avenue to St. Andrew Place
<br />Type of Work: Road Widening Project Description
<br />Type of Work Description: Road Widening - Add Bristol Street from Warner Ave to St. Andrew PI would be widened to a total of six lanes (three lanes in
<br />2 lanes to existing roadway in project limits each direction) to be consistent with the City of Santa Ana General Plan Circulation Element and the
<br />County of Orange MPAH.
<br />Limits FISCAL TOTAL
<br />FUND TYPE ENG ROW CON/IMP O&M TOTAL
<br />Warner Avenue to St. Andrew Place YEAR ESCALATED
<br />Project Notes 2023 Arterial Capacity $0 $0 $7,501,206 $0 $7,501,206 $7,726,242
<br />CARRY FORWARD FOR ACTIVE PROJECT Enhancements (ACE)
<br />EXPENDITURES IN FY22/23 2023 Federal $0 $0 $1,508,045 $0 $1,508,045 $1,553,286
<br />2023 Other $0 $0 $992,357 $0 $992,357 $1,022,128
<br />Totals: $0 $0 $10,001,608 $0 $10,001,608 $10,301,656
<br />Total Programmed: $10,001,608I
<br />79