Laserfiche WebLink
SA-2 Pressure Control Station Relocation <br />and Transmission Main Improvements <br />RFP No. 21-127 <br />Neha Gajjar, PE <br />Assistant Proje-} Manager <br />Ms. Gajjar has more than 29 years of experience providing project <br />management, planning, and design of water transmission, <br />distribution, and storage facilities projects. Neha has significant <br />experience preparing plans and specifications for water/sewer <br />mains, storm drains, pipelines, and has an intimate understanding <br />of these requirements for many municipalities. Her responsibilities <br />as engineering lead include establishing design parameters, <br />managing project schedules, and handling required appropriate <br />technical resources necessary for each project. <br />EXPERIENCE <br />SA-1 Hvdro-Generator Replacement. Citv of Santa Ana. CA. <br />Assistant Project Manager. Engineering design services for <br />replacement of a 33-year old turbine generator. Services include <br />removing the existing turbine/generator, installing a new unit and <br />connecting to the electrical and control systems, upgrading the <br />ventilation s stem new RTU control anel coordination with Enter rise <br />Education: <br />BS, Civil Engineering, <br />University of California at <br />Berkeley, 1991 <br />Registrations/Certifications: <br />Professional Civil Engineer, <br />California, No. 55574, 1996 <br />Professional Affiliations: <br />American Society of Civil <br />Engineers <br />Society of Women <br />Engineers <br />Office Location: <br />Irvine, CA <br />Y I p I p <br />Automation, and replacement of the existing switchboard and MCC. The demolition of the existing unit <br />will include the removal of the generator, turbine shaft, impellers and upper housing. Replacement will <br />include new construction involving, new motorized valve upstream of the new turbine/generator, new <br />manual valve downstream, new ball valve with motorized flow controller, and new PRV valve (in series). <br />North Long Beach Collection Main Control Valve Upgrade, Long Beach Water Department, Long <br />Beach, CA. Project Manager. Tetra Tech prepared plans and specifications to upgrade an existing flow <br />control/pressure reducing station, which consists of replacing the 16-inch butterfly valve at Wardlow <br />Avenue and the pressure transmitter vault within Cherry Avenue. The improvement to these facilities <br />will allow LBWD to mitigate the open conduit flow it experiences at the high point within the collection <br />main pipeline by throttling the flow to create backpressure and have the pipeline flow full. <br />ua raima Ave. ana i ustin Ave. Watermain rcepiacemenis at uL, i A Crossing, Lary or Anaheim, <br />Project Manager. The OCTA planned to construct an additional railroad track for the Metrolink <br />within its existing right-of-way as part of the Anaheim Canyon Station Metrolink Project. The new tracks <br />cross City of Anaheim water mains at La Palma Avenue and Tustin Avenue and therefore the mains <br />must be rerouted and placed within a steel casing. Tetra Tech prepared plans and specifications to <br />replace the existing 36-inch CCP with a 36-inch steel in a 48-inch steel casing in La Palma Avenue, the <br />existing 12-inch CIP with a 12-inch DIP in a 24-inch steel casing in La Palma Avenue, and the existing <br />12-inch CIP with a 12-inch DIP in a 24-inch steel casing in Tustin Avenue. The project also included <br />coordination with OCTA. <br />San Antonio Pressure Reducing Station Upgrade, Yorba Linda Water District, Yorba Linda, CA. <br />Project Engineer for preparation of plans and specification for improvements to the existing San <br />Antonio PRS. This project included modification of the existing vault roof to accommodate new access <br />hatches and replacement of the internal manifold. <br />Drncc. D-A..-;-- 1/,1-- D--^k 1A/,+-r r%;,+rin+ Ir..ir,n r'A Project Engineer <br />for preparation of a preliminary design report, plans, and specifications for construction of modifications <br />to seven existing domestic water closed -system pressure reducing valves, relocating existing isolation <br />valves inside or outside the vaults, and addition of pressure sensors, valve position indicators, <br />telemetry signals and/or new telemetry facilities to reduce the risk of over -pressurizing services and <br />customer facilities if a valve fails open. <br />TETRA TECH <br />