SA-2 Pressure Control Station Relocation
<br />and Transmission Main Improvements
<br />RFP No. 21-127
<br />Erica Jenkins
<br />9esigr '-igineer
<br />Ms. Jenkins has more than 28 years of experience and has been
<br />responsible for the preparation of water, sewer, reclaimed water
<br />pipeline projects, and project design reports for various water and
<br />sewer facilities. Erica has been responsible for completing the
<br />design, bidding, and construction management of over 150 miles of
<br />water/reclaimed water/sewer mains throughout Southern California.
<br />EXPERIENCE
<br />Education:
<br />BS, Civil Engineering,
<br />California State University,
<br />Fullerton, 1996
<br />Reg istrations/Certifications:
<br />Engineer -in -Training,
<br />California, No. EX102020
<br />Office Location:
<br />Irvine, CA
<br />Total Years of Experience:
<br />28
<br />..,�.w,. dill Boulevard Water Main Replacement, JA Salazar, Years with Tetra Tech:
<br />Compton, CA. As Lead Design Engineer completed the design plans 28
<br />for a water main project in the City of Claremont and Los Angeles
<br />County. The work was completed as part of a design -build contract with JA Salazar. Work included:
<br />existing utility research and base map preparation, determining abandonment required, alignment
<br />selection and field check surveys, interaction with client and GSWC project manager with plan check
<br />comments, procurement of permit. Total water main footage was approximately 4,500 feet of 8-inch
<br />and 12-inch pipe.
<br />Compton Area Water Main Replacement, Precision Pipeline, Compton, CA As Lead Design
<br />Engineer completed the design plans for a water main project in the City of Compton and Los Angeles
<br />County. The work was completed as part of a design -build contract with Precision Pipeline. Work
<br />included: existing utility research and base map preparation, determining abandonment required,
<br />alignment selection and field check surveys, interaction with client and GSWC project manager with
<br />plan check comments, procurement of permit. Total water main footage was approximately 20,000 feet
<br />of 8-inch pipe.
<br />Atkinson Area Main Replacement, Precision Pipeline, Hawthorne and Inglewood, Cl- As Lead
<br />Design Engineer completed the design plans for a water main project in the City of Hawthorne and
<br />Inglewood. The work was completed as part of a design -build contract with Precision Pipeline. Work
<br />included: existing utility research and base map preparation, determining abandonment required,
<br />alignment selection and field check surveys, interaction with client and GSWC project manager with
<br />plan check comments, procurement of permit. Total water main footage was approximately 17,000 feet
<br />of 8-inch pipe.
<br />Lennox Boulevard Area Water Main Replacement, Golden State Water Compal_„ __ __ As Lead
<br />Design Engineer completed the design plans for water main projects in the Southwest District in the
<br />City of Lennox. Work included: existing utility research and base map preparation, determining
<br />abandonment required, alignment selection and field check surveys, interaction with GSWC project
<br />manager with plan check comments, obtained approval of fire hydrant locations from Los Angeles
<br />County Fire Department, and prepared letter and exhibits for DPH approval. Total water main footage
<br />was approximately 13,000 feet of 8-inch pipe.
<br />Santa Ana Canyon Road Transmission Main and Pressure Reducing Station No. 67, Cit,
<br />Anaheim, CA Design Engineer for the preparation of plans, specifications, cost estimates and
<br />construction services for the construction of 2,000 linear feet of 36-inch steel pipeline. In addition to the
<br />construction of steel piping, a pressure reducing station was constructed to reduce pressure from Zone
<br />750 to Zone 640 and Zone 475.
<br />Anaheim Hills Koad I ransmission Main Phase I, GO of Anaheim, G,P Design Engineer of
<br />approximately 3,500 linear feet of 30-inch water main parallel to the existing 21-inch and 24-inch diameter
<br />water main in Anaheim Hills Road from Nohl Ranch Road to Santa Ana Canyon Road. Intermediate tie-ins
<br />were designed to connect to the existing 10-inch water mains on La Paz Way (PR-54).
<br />TETRA TECH
<br />
|