Laserfiche WebLink
SA-2 Pressure Control Station Relocation <br />and Transmission Main Improvements <br />RFP No. 21-127 <br />Erica Jenkins <br />9esigr '-igineer <br />Ms. Jenkins has more than 28 years of experience and has been <br />responsible for the preparation of water, sewer, reclaimed water <br />pipeline projects, and project design reports for various water and <br />sewer facilities. Erica has been responsible for completing the <br />design, bidding, and construction management of over 150 miles of <br />water/reclaimed water/sewer mains throughout Southern California. <br />EXPERIENCE <br />Education: <br />BS, Civil Engineering, <br />California State University, <br />Fullerton, 1996 <br />Reg istrations/Certifications: <br />Engineer -in -Training, <br />California, No. EX102020 <br />Office Location: <br />Irvine, CA <br />Total Years of Experience: <br />28 <br />..,�.w,. dill Boulevard Water Main Replacement, JA Salazar, Years with Tetra Tech: <br />Compton, CA. As Lead Design Engineer completed the design plans 28 <br />for a water main project in the City of Claremont and Los Angeles <br />County. The work was completed as part of a design -build contract with JA Salazar. Work included: <br />existing utility research and base map preparation, determining abandonment required, alignment <br />selection and field check surveys, interaction with client and GSWC project manager with plan check <br />comments, procurement of permit. Total water main footage was approximately 4,500 feet of 8-inch <br />and 12-inch pipe. <br />Compton Area Water Main Replacement, Precision Pipeline, Compton, CA As Lead Design <br />Engineer completed the design plans for a water main project in the City of Compton and Los Angeles <br />County. The work was completed as part of a design -build contract with Precision Pipeline. Work <br />included: existing utility research and base map preparation, determining abandonment required, <br />alignment selection and field check surveys, interaction with client and GSWC project manager with <br />plan check comments, procurement of permit. Total water main footage was approximately 20,000 feet <br />of 8-inch pipe. <br />Atkinson Area Main Replacement, Precision Pipeline, Hawthorne and Inglewood, Cl- As Lead <br />Design Engineer completed the design plans for a water main project in the City of Hawthorne and <br />Inglewood. The work was completed as part of a design -build contract with Precision Pipeline. Work <br />included: existing utility research and base map preparation, determining abandonment required, <br />alignment selection and field check surveys, interaction with client and GSWC project manager with <br />plan check comments, procurement of permit. Total water main footage was approximately 17,000 feet <br />of 8-inch pipe. <br />Lennox Boulevard Area Water Main Replacement, Golden State Water Compal_„ __ __ As Lead <br />Design Engineer completed the design plans for water main projects in the Southwest District in the <br />City of Lennox. Work included: existing utility research and base map preparation, determining <br />abandonment required, alignment selection and field check surveys, interaction with GSWC project <br />manager with plan check comments, obtained approval of fire hydrant locations from Los Angeles <br />County Fire Department, and prepared letter and exhibits for DPH approval. Total water main footage <br />was approximately 13,000 feet of 8-inch pipe. <br />Santa Ana Canyon Road Transmission Main and Pressure Reducing Station No. 67, Cit, <br />Anaheim, CA Design Engineer for the preparation of plans, specifications, cost estimates and <br />construction services for the construction of 2,000 linear feet of 36-inch steel pipeline. In addition to the <br />construction of steel piping, a pressure reducing station was constructed to reduce pressure from Zone <br />750 to Zone 640 and Zone 475. <br />Anaheim Hills Koad I ransmission Main Phase I, GO of Anaheim, G,P Design Engineer of <br />approximately 3,500 linear feet of 30-inch water main parallel to the existing 21-inch and 24-inch diameter <br />water main in Anaheim Hills Road from Nohl Ranch Road to Santa Ana Canyon Road. Intermediate tie-ins <br />were designed to connect to the existing 10-inch water mains on La Paz Way (PR-54). <br />TETRA TECH <br />