Laserfiche WebLink
SA-2 Pressure Control Station Relocation <br />and Transmission Main Improvements <br />RFP No. 21-127 <br />rivers, lakes, and oceans within the greater Los Angeles area. In addition, the project was designed <br />to achieve a Platinum EnvisionTm rating. <br />Storn-----`-�- "aptur- n--gram, �:� . _t __ "ygeles, p'• __.. _r Engine -ring, L��- A___ios, <br />rA Program Manager. Serving as the Program Manager for the City of Los Angeles' Stormwater <br />Capture Parks Program, for which he is overseeing pre -design services for the development of four <br />stormwater capture projects as part of the second largest stormwater program undertaken in the <br />state's history. In addition, Mr. Fussel is leading a programmatic watershed analysis of nine (9) projects <br />to ensure project goals are met and to determine possible efficiencies in linking multiple project sites <br />together and measuring their performance. <br />Bolivar Park Stormwater and Runoff Capture Project, City of Lakewood, Ci Engineering <br />Design Lead and Engineer of Record. Mr. Fussel is responsible for feasibility, conceptual and <br />detailed design services to prepare final plans, specifications and estimates. Tetra Tech was <br />contracted to evaluate the potential site location and develop this stormwater runoff and capture <br />project. The project consists of an air -inflated rubber dam diversion system to re -direct all urban <br />runoff and stormwater runoff from the Del Amo channel through a pre-treatment system to remove <br />trash, debris, and sediment. A pump station and drainage pipeline will convey the water into a large, <br />buried multi -chambered storage/infiltration facility. The stormwater collected in the underground <br />reservoir will be treated and used to irrigate the park's landscaped areas. The system will monitor the <br />weather conditions and the facility through a secured cloud -based system. The underground storage <br />system is 2.8 million gallons (8.7 ac-ft). The goal of the project is to not only help the City comply with <br />the metals Total Maximum Daily Loads, as presented in the Los Cerritos Channel Watershed <br />Management Program, but also provide additional benefits, such as revitalized park infrastructure <br />and augmentation of local water supplies. <br />Environmental and Engineering Support for Vandenberg Tracking Station V%1-4— ""^;- <br />Amerir_an Water Fnternrises_ Inr___ Vandenhern Air Fnrr_e Rase_ Lmmnnr__ r-Project Manager. <br />Tetra Tech was contracted to provide environmental and engineering support services for the <br />installation of a 4-inch water line and associated appurtenances at the Vandenberg Tracking Station <br />at Vandenberg Air Force Base. Mr. Fussel was responsible for overseeing the survey and field <br />verification, engineering design, and preparation of as -built drawings. <br />.1ayfair Park Stormwater and Runoff Capture Project, City of Lakewood, Cl- Engineering Design <br />Lead and Engineer of Record. Responsible for feasibility, conceptual and detailed design services to <br />prepare final plans, specifications and estimates. Tetra Tech was contracted to evaluate the potential <br />site location and develop this stormwater runoff and capture project. The project consists of an air - <br />inflated rubber dam diversion system to re -direct all urban runoff and stormwater runoff from the Clark <br />Channel through a pre-treatment system to remove trash, debris, and sediment. A drainage pipeline will <br />convey the water into a large, buried multi -chambered storage and filtration facility. The stormwater <br />collected in the underground reservoir will be treated and used to irrigate the park's landscaped areas. <br />The system will monitor the weather conditions and the facility through a secured cloud based system. <br />The underground storage system is 4.5 million gallons (13.8 ac-ft). The goal of the project is to not only <br />help the City comply with the metals Total Maximum Daily Loads, as presented in the Los Cerritos <br />Channel Watershed Management Program, but also provide additional benefits, such as revitalized <br />park infrastructure and augmentation of local water supplies. <br />TETRA TECH J. Fussel - Page 12 <br />