My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Pressure Control Station Relocation and Transmission Main Improvements
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
05/17/2022 Special and Regular
>
Item 21 - Pressure Control Station Relocation and Transmission Main Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2024 4:44:00 PM
Creation date
8/15/2023 1:44:49 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
21
Date
5/17/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 2 <br />PROJECT TITLE: <br />SA-2 Vault Improvements <br />PROJECT CATEGORY: <br />Utility/Drainage/Lighting <br />Improvements <br />Municipal Facilities <br />LOCATION MAP /A <br />CITY OF SANTA ANA FY 21/22CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />This project will replace the existing vault and mechanical, electrical, <br />instrumentation and controls systems. <br />PROJECT NEED: <br />Replacement of this water connection will ensure system reliability and <br />availability to the City's customers. <br />PROJECT COSTS FY 21/22 FY 22/23 FY 23124 FY 24125 FY 25126 FY 26/27 FY 27/28 <br />Engineering 830,000 - - - - - - <br />Right -Of -Way - <br />TOTAL 830,000 - - <br />SOURCE OF FUNDS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 <br />WATER CAPITAL 830,000 - - - - - - <br />TOTAL 830,000 - - <br />AGENCY: DIVISION: CONTACT: DATE: <br />Public Works Water Resources Armando Fernandez, Senior Civil Engineer 25-Apr-2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.