Laserfiche WebLink
NAREE KIM, PE <br />Traffic Engineering Task Support <br />Von Karman Avenue/Tustin Ranch Road Regional <br />Traffic Signal Synchronization (RTSSP) Project — <br />City of Irvine, CA <br />Mrs. Kim serves as Reviewer for this project in which <br />Iteris is assisting the City with multi -jurisdictional <br />improvements of the 7.9-mile stretch of Von Karman <br />Avenue and Tustin Ranch Road in the cities of Irvine <br />and Tustin. The project requires retiming of 30 <br />signalized intersections, which includes the two <br />Caltrans crossings at the 1-5 interchange. Iteris will <br />assist the agencies with the design and construction <br />management of the new signal improvements which <br />include new Video Detection Systems (VDS), <br />controller cabinets, pedestrian heads, first fiber <br />communication to Tustin signals and a new <br />Advanced Traffic Management System (ATMS) to <br />remotely monitor the signals. Iteris also assisted <br />with conversion of new configuration modules to <br />transition existing signals online in their Actra system <br />to their newer Centracs system. The project began in <br />April 2017 and is scheduled to be completed in June <br />2019. Two years of Operations and Maintenance will <br />occur from July 2019 through September 2022. <br />Von Karman Avenue/Tustin Ranch Road RTSSP <br />Project — City of Irvine, CA <br />Mrs. Kim serves as Reviewer for this project in which <br />Iteris is assisting the City with multi -jurisdictional <br />improvements of the 7.9-mile stretch of Von Karman <br />Avenue and Tustin Ranch Road in the cities of Irvine <br />and Tustin. The project requires retiming of 30 <br />signalized intersections, which includes the two <br />Caltrans crossings at the 1-5 interchange. Iteris will <br />assist the agencies with the design and construction <br />management of the new signal improvements which <br />include new Video Detection Systems (VDS), <br />controller cabinets, pedestrian heads, first fiber <br />communication to Tustin signals and a new <br />Advanced Traffic Management System (ATMS) to <br />remotely monitor the signals. Iteris also assisted <br />with conversion of new configuration modules to <br />transition existing signals online in their Actra system <br />to their newer Centracs system. The project began in <br />April 2017 and is scheduled to be completed in June <br />2019. Two years of Operations and Maintenance will <br />occur from July 2019 through September 2022. <br />Traffic and Intelligent Transportation Systems <br />Engineering Services, Main Street RTSSP, OCTA — <br />Orange County, CA <br />Mrs. Kim serves as Project Engineer under this <br />project agreement, which will provide services <br />that will upgrade traffic signal electronics and <br />communications equipment, and optimize signal <br />iteris <br />timing along Main Street, a major north -south <br />corridor that comprises 67 major signalized <br />intersections. As part of the project, Iteris' <br />Intersection-as-a-Servicel" end -to -end solution <br />offering will deliver proactive monitoring of traffic <br />signal operations at all project intersections. The <br />primary goal of this project is to deploy new <br />Intelligent Transportation System (ITS) equipment <br />and communication infrastructure to support the <br />management of the cities' transportation network, <br />implement optimized coordination timing plans to <br />achieve optimal traffic flow, and improve safety for <br />all road users, including vehicles, buses, bicycles, and <br />pedestrians. The project began in December 2019 <br />and is ongoing. <br />MacArthur Boulevard Regional Traffic Signal <br />Synchronization Program (RTSSP) Project — Cities <br />of Irvine and Newport Beach, CA <br />Mrs. Kim serves as Project Manager for this project <br />which involves signal synchronization and <br />equipment upgrades along MacArthur Boulevard <br />from Pacific Coast Highway (PCH) and State Route 55 <br />(SR-55) ramps, spanning across the Cities of Irvine <br />and Newport Beach. The project was funded by <br />Measure M2 funds, with the City of Irvine serving as <br />the lead agency. The corridor spans 8.2 miles <br />totaling 22 traffic signals. Iteris is providing updated <br />clearance parameters for the safety of vehicles, <br />pedestrians, and bicyclist accompanied with new <br />coordinated plans that will provide progression <br />improvement along MacArthur Boulevard corridor <br />without significantly increasing delays on the side <br />streets. The project began in March 2020 and will be <br />complete in December 2023, followed by two years <br />of Operations and Maintenance. <br />151" St. Rehabilitation — City of Newport Beach, CA <br />Mrs. Kim served as Task Lead for this design and <br />construction project for the City of Newport <br />Beach. The project was divided into two phases. For <br />the initial preliminary engineering phase, the team <br />performed detailed field investigation of the <br />15t" Street and Balboa Boulevard to identify <br />deficiencies and recommended improvements to <br />enhance safety and traffic flow including median <br />concepts and community meetings. Upon City's <br />approval of the Preliminary Design Concept, the <br />full Plans, Specifications and Estimate (PS&E) package <br />was prepared during the design phase, which includes <br />traffic signal upgrades, signing and striping <br />modifications for entire 15t" Street in Harbor Island <br />area. The design phase completed in December 2015 <br />and construction completed in May 2016. <br />