Laserfiche WebLink
MENDEZ HISTORIC TRAIL <br />WESTMINSTER, CA <br />(2019 - 2021) <br />Fehr & Peers is currently involved in the design of a two-way, class IV bicycle facility for the City of <br />Westminster. Fehr & Peers lead the design for traffic signal modifications and street lighting associated <br />with the new bikeway. The new class IV bikeway repurposes the cross section on Hoover to remove one <br />travel lane, shifts traffic and includes new bicycle traffic signals, bicycle detection, new ATC controllers, <br />video detection, push buttons and other traffic signal upgrades intended to improve traffic flow and safety <br />for all users throughout the corridor.We also prepared updated Traffic Impact Analysis Guidelines for <br />each city. <br />Adolfo Ozaeta, City Traffic Engineer, City of Jason Pack <br />Westminster Claude Strayer <br />8200 Westminster Blvd., Westminster, CA 92683 Mike Johnstone <br />e: aozaeta@westminster-ca.gov 1 (714) 548-3462 <br />Total Cost: <br />$56,000 <br />®�ees�o>oe <br />m�e>voo>oe <br />F%. R.n�pAD_ <br />PRE-EMPTI6N {TO REM>i N1 <br />tS <br />hlli <br />E %I5RAtA PRUP(Y..FD P.ASF DInf:RAM .. ' I e I u r�� II �s �l <br />T <br />t al��dt <br />k <br />h <br />a REVISIONS REFERENCES APPROVALS L <br />®000��oeaeoaos�� <br />0000amr��o�o©�oQ�r <br />r��aoo�®eoAeom�Q�r�� <br />�omm��r•�o�eo�mo�� <br />o�aa�ee�aeea��e <br />a0ee��eeee®iar�Q�� <br />.ems m m..ow rw enr- a •wu <br />ewa�no-�.wa m�'a.r...[ <br />e�' <br />P11 F I —ATIDN PUS. <br />eu"C)N <br />LV CATS <br />'�• "a'�'I <br />DAIL �A" <br />_ ., <br />SIGN E'E.n <br />UE <br />yg TRUCK <br />gd:�i n R011TE <br />LM <br />G1G�4M <br />® O <br />i vN <br />_ <br />f:DNSTRIIf.TIDN N(]TFC <br />(TH{C HEFT !iN v1 <br />MENDEZ HISTORIC TRAIL <br />HOOVER 5Y d EQLSA AVE TS, <br />SIGNAL MOpIEICATION PLAN <br />nF l4irslm insirr — �nginrrn Rg �trpt. �ea� �o <br />RFP NO.: 21-125 17 <br />