Laserfiche WebLink
Lydia La Point, PE, LEED AP <br />Transportation Engineer <br />Transportation Engineer <br />IBI Group <br />AIIIIIP� Ms. La Point is a Civil Engineer with 18 <br />years of experience with IBI Group. Her depth and breadth of <br />planning and engineering experience includes active transportation <br />projects, pedestrian and bicycle plans, Complete Streets, road <br />diets, corridor studies, Project Study Reports, multi -modal studies, <br />mobility hub design, grant funding applications, and the preparation <br />of conceptual design and engineering plans, specifications and <br />estimates. She understands the relationship between transportation <br />and land use, and the elements of design that make modes of travel <br />and public spaces attractive and inviting. She also has extensive <br />experience with public outreach and agency coordination, and <br />incorporating public and stakeholder feedback into design. Ms. La <br />Point is currently the engineering task lead for Metro's North San <br />Fernando Valley Bus Rapid Transit Corridor Study and the Metro <br />Purple Line First/Last Mile Project. <br />Karen Sujata, PE <br />Transportation Engineer <br />Transportation Engineer <br />IBI Group <br />Ms. Sujata is a Transportation Engineer at IBI <br />Group with experience in preparation of local street improvement <br />plans, signing and striping plans, bike path plans, surface parking <br />lot and parking structure conceptual plans, as well as multimodal <br />level of service analyses, comprehensive evaluations and reports, <br />and traffic impact analyses for various transportation projects <br />throughout California. She also has experience working on projects <br />which have implemented active transportation concept elements, <br />such as bike boulevards and complete streets planning and design. <br />Ms. Sujata is adept in a range of software including AutoCAD, <br />MicroStation, Synchro, and Traffix. Her versatility and expertise can <br />be seen on a wide variety of transportation projects. Ms. Sujata is <br />registered as a Civil Engineer in the State of California. <br />EDUCATION <br />B.S. (Civil Engineering with a Minor in <br />Information and Computer Science), <br />University of California, Irvine, 2003 <br />SELECTIVE RELEVANT EXPERIENCE <br />• North San Fernando <br />Valley Bus Rapid Transit <br />(BRT) Corridor Planning <br />and Environmental Study, <br />San Fernando, CA <br />• Metro Purple Line First/ <br />Last Mile Project, Los <br />Angeles, CA <br />• Figueroa Corridor <br />Streetscape Project, Los <br />Angeles, CA <br />• Metro Bus Rapid Transit <br />Vision and Principles <br />Study, Los Angeles, CA <br />• Fourth District Bikeways <br />Collaborative, Orange <br />County, CA <br />EDUCATION <br />B.S. (Civil Engineering) <br />University of California, Irvine, CA, <br />2014 <br />M.S. (Civil Engineering) <br />University of California, Irvine, CA, <br />2015 <br />SELECTIVE RELEVANT EXPERIENCE <br />• North San Fernando <br />Valley BRT Corridor, Los <br />Angeles, CA <br />• TRIP Centennial Corridor, <br />Bakersfield, CA <br />• CRA/LA Figueroa <br />Streetscape, Los <br />Angeles, CA <br />• Santa Clara Valley <br />Transportation Authority <br />Facilities Master Plan, <br />San Jose, CA <br />• Wilshire Avenue Bicycle <br />Boulevard, Fullerton, CA <br />ON -CALL TRANSPORTATION AND TRAFFIC ENGINEERING SERVICES - RFP NO. 21-125 <br />