Laserfiche WebLink
Sample Project Schedule <br />Iteris has provided the following sample schedule as shown in Figure 3 for the recent Main Street RTSS Project. <br />Figure 3 — Proposed Project Schedule <br />1 <br />1.0 Project Management {PI Phase} <br />2-0 Data Collection <br />318 days <br />5S days <br />Mon 4/1/19 <br />Wed 6/17/2o <br />V <br />1! <br />qP <br />1♦ <br />-- <br />- - <br />— - - <br />— - - <br />— - <br />2D <br />21 <br />Tue 412/19 <br />Mon 6/17/19 <br />27 <br />3.0 Field Review and P5&E <br />4.0 Corridor 'Before' Studies <br />S.D Signal Tim irig Optimization and Implementation <br />6.0 Cnrridor'After' Studies <br />28 <br />40 days <br />Tue 412/19 <br />Mon 5/27/19 <br />33 <br />34 <br />41 days Fri 4/12/19 <br />Fri 617/19 <br />39 <br />40 <br />245 days Tue 4116119 <br />Mon 3/23/20 <br />51 <br />Fri Sf 1/20 <br />52 <br />3S days Mon 3f 16f20 <br />57 <br />58 <br />7.0 Synchronization System Construction <br />226 days Mon 4f 15/19 <br />Mon 2/24/20 <br />68 <br />&D Operations Maintenance and Monitoring Phase <br />8.1 Project Management (OMM Phase) <br />8.2 Continuing Signal Timing Support <br />9.D Project Report <br />9.1 Project Report (PI Phase) <br />543 days <br />541 days <br />521 days <br />568 days <br />25 days <br />Mon 6/1/20 <br />Wed 6f 3/20 <br />Mon 6f 1/20 <br />Mon 4/27/20 <br />Mon 4/27/20 <br />Wed 6/29/22 <br />Wed 6129/22 <br />Mon 5/30/22 <br />Wed 6/29/22 <br />Fri 5/29/20 <br />69 <br />70 <br />97 <br />99 <br />100 <br />101 <br />106 <br />9.2 Project Report (OMM Phase) <br />19.0 Traffic Signal Modeling Support <br />22 days <br />15 days <br />Tue 5131/22 <br />Mon 4115119 <br />Wed 6/29/22 <br />Fri S13/19 <br />V=9 <br />- - <br />111 <br />112 <br />Santa Ana, On -Call Transportation & Traffic Engineering Services (RFP No. 21-125) Iteris, Inc. 130 <br />