My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 41 - EIR No. 2020-03 and GPA No.2020-06 Santa Ana General Plan Update
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
12/21/2021 Regular
>
Item 41 - EIR No. 2020-03 and GPA No.2020-06 Santa Ana General Plan Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2023 3:45:18 PM
Creation date
8/16/2023 3:41:38 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
41
Date
12/21/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL PLAN UPDATE MITIGATION MONITORING AND REPORTING PROGRAM <br />CITY OF SANTA ANA <br />Mitigation Monitoring and Reporting Program <br />Table 1-3 Mitigation Monitoring and Reporting Requirements <br />Responsible <br />Document <br />Location <br />Completion Date <br />Implementing Responsible Monitoring Responsible Project Mitigation <br />Mitigation Measure Timing Party Monitoring Party Record) Monitoring Party Monitor <br />GHG inventories of existing and forecast year GHG levels. <br />Tools and strategies for reducing GHG emissions to ensure a <br />trajectory with the long-term GHG reduction goal of Executive <br />Order S-03-05. <br />Plan implementation guidance that includes, at minimum, the <br />following components consistent with the proposed CAP: <br />Administration and Staffing <br />Finance and Budgeting <br />Timelines for Measure Implementation <br />Community Outreach and Education <br />Monitoring, Reporting, and Adaptive Management <br />Tracking Tools <br />Furthermore, the following measures will be considered when the City <br />updates the Climate Action Plan: <br />Measures to protect the most vulnerable populations <br />Measure to increase carbon sinks <br />Standards for electric vehicle parking <br />Standards for construction projects <br />5.12 NOISE <br />N-1 Construction contractors shall implement the following measures for Prior to issuance Project City of Santa City of Santa <br />construction activities conducted in the City of Santa Ana. Construction of demolition, Applicant/ Ana Building Ana Building <br />plans submitted to the City shall identify these measures on demolition, grading, and/or Developer and Safety Division Safety <br />grading, and construction plans submitted to the City: The City of Santa building permits Architect Division <br />Ana Planning and Building Agency shall verify that grading, demolition, <br />and/or construction plans submitted to the City include these notations <br />prior to issuance of demolition, grading, and/or building permits. <br />Construction activity is limited to the hours: Between 7 AM to 8 <br />PM Monday through Saturday, as prescribed in Municipal Code <br />Section 18-314(e). Construction is prohibited on Sundays. <br />During the entire active construction period, equipment and trucks <br />used for project construction shall use the best -available noise <br />control techniques (e.g., improved mufflers, equipment re -design, <br />Page 1 ace ork r
The URL can be used to link to this page
Your browser does not support the video tag.