My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 41 - EIR No. 2020-03 and GPA No.2020-06 Santa Ana General Plan Update
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
12/21/2021 Regular
>
Item 41 - EIR No. 2020-03 and GPA No.2020-06 Santa Ana General Plan Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2023 3:45:18 PM
Creation date
8/16/2023 3:41:38 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
41
Date
12/21/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL PLAN UPDATE MITIGATION MONITORING AND REPORTING PROGRAM <br />CITY OF SANTA ANA <br />Mitigation Monitoring and Reporting Program <br />Table 1-3 Mitigation Monitoring and Reporting Requirements <br />Document Completion Date <br />Responsible Location <br />Implementing Responsible Monitoring Responsible Project Mitigation <br />Mitigation Measure Timing Party Monitoring Party Record) Monitoring Party Monitor <br />undisturbed soil. The archaeologist shall inform all construction <br />personnel prior to construction activities of the proper procedures in the <br />event of an archaeological discovery. The training shall be held in <br />conjunction with the project's initial on -site safety meeting and shall <br />explain the importance and legal basis for the protection of significant <br />archaeological resources. In the event that archaeological resources <br />artifacts or features) are exposed during ground -disturbing activities, <br />construction activities in the immediate vicinity of the discovery shall be <br />halted while the resources are evaluated for significance by an <br />archaeologist who meets the Secretary's Standards, and tribal <br />consultation shall be conducted in the case of a tribal resource. If the <br />discovery proves to be significant, the long-term disposition of any <br />collected materials should be determined in consultation with the <br />affiliated tribe(s), where relevant; this could include curation with a <br />recognized scientific or educational repository, transfer to the tribe, or <br />respectful reinternment in an area designated by the tribe. <br />CUL-7 If an Archaeological Resources Assessment does not identify Prior to Project City of Santa City of Santa <br />potentially significant archaeological resources but the site has construction Applicant/ Ana Building Ana Building <br />moderate sensitivity for archaeological resources (Mitigation Measure activities Developer Safety Division Safety <br />CUL-4), an archaeologist who meets the Secretary's Standards shall Division <br />be retained on call. The archaeologist shall inform all construction <br />personnel prior to construction activities about the proper procedures in <br />the event of an archaeological discovery. The pre -construction training <br />shall be held in conjunction with the project's initial on -site safety <br />meeting and shall explain the importance and legal basis for the <br />protection of significant archaeological resources. In the event that <br />archaeological resources (artifacts or features) are exposed during <br />ground -disturbing activities, construction activities in the immediate <br />vicinity of the discovery shall be halted while the on -call archaeologist is <br />contacted. The resource shall be evaluated for significance and tribal <br />consultation shall be conducted, in the case of a tribal resource. If the <br />discovery proves to be significant, the long-term disposition of any <br />October 2 age 23
The URL can be used to link to this page
Your browser does not support the video tag.