My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 41 - EIR No. 2020-03 and GPA No.2020-06 Santa Ana General Plan Update
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
12/21/2021 Regular
>
Item 41 - EIR No. 2020-03 and GPA No.2020-06 Santa Ana General Plan Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2023 3:45:18 PM
Creation date
8/16/2023 3:41:38 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
41
Date
12/21/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Santa Ana Boulevard between French Street and Santiago Street (currently Primary <br />Arterial) <br />Santa Ana Boulevard between Raitt Street and Flower Street (currently Major Arterial) <br />Cambridge Street between Fairhaven Avenue and SR-22 freeway (currently Local <br />Arterial) <br />Hazard Avenue between Euclid Street and Harbor Boulevard (currently Secondary <br />Arterial) <br />Halladay Avenue between Warner Avenue and Dyer Road (currently Secondary Arterial) <br />McFadden Avenue between Harbor Boulevard and Grand Avenue (currently Secondary <br />Arterial) <br />Broadway between 1st Street and 17th Street (currently Secondary Arterial) <br />4th Street between French Street and Grand Avenue (currently Primary/Secondary <br />Arterial) <br />Fairhaven Avenue from Grand Avenue to Tustin Avenue (currently Secondary Arterial) <br />Reclassified as Primary Arterial: <br />Santa Ana Boulevard between Flower Street and Ross Street (currently a Major Arterial) <br />1st Street between Bristol Street and Tustin Avenue (currently Major Arterial) <br />Reclassify as Collector Arterial: <br />Civic Center Drive between French Street and Santiago Street (currently a Secondary <br />Arterial) <br />Add the following to the MPSH as Divided Collector Arterial: <br />Greenville Street between Segerstrom Avenue and Warner Avenue <br />Add the following to the MPSH as Collector Streets: <br />Civic Center Drive between Spurgeon Street and Santiago Street (currently Local Street) <br />Broadway from Anahurt Street to Main Street (currently Local Road) <br />Remove the following from the MPSH <br />Memory Lane from the City Center Drive to SR-22 <br />Wright Street from 14th Street to Fruit Street <br />4th Street from French Street to Ross Street <br />Washington Avenue from Broadway to Main Street <br />10th street from Broadway to Main Street <br />Columbine Avenue from Main Street to 55 FWY <br />Halladay street from Dyer Road to Alton pkwy <br />Santa Ana General Plan Update <br />CE <br />i <br />i i5 4 FactanStatement41 — 33 12//2 11 / 0211 <br />Of ve ri ing onsiderations -10- October 2021
The URL can be used to link to this page
Your browser does not support the video tag.