Laserfiche WebLink
EXHIBIT 4 <br />Construction Contract 5,922,025.00$ <br />Contract Administration, Inspection and Testing 180,000.00$ <br />Contingencies 997,975.00$ <br />Water Engineering 150,000.00$ <br />TOTAL ESTIMATED CONSTRUCTION COSTS 7,250,000.00$ <br />CONSTRUCTION OF PROJECT NOS. 19-6438, 19-6439, 19-6440: RITCHEY <br />STREET WATER MAIN, SA-7 PRESSURE REGULATING STATION, AND SR-55 <br />WATER MAIN CROSSING <br />COST ANALYSIS