My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 26 - Grant Application for Solar Power Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
12/07/2021 Regular
>
Item 26 - Grant Application for Solar Power Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 8:46:28 AM
Creation date
8/17/2023 11:57:11 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
26
Date
12/7/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
183
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
K <br />Generation of Solar Power at Garthe and West Pump Station Facilities Project <br />Bureau of Reclamation Water Energy and Efficiency Grant FY2022 <br />Table 2. Non- Federal Funding Summary <br />D.8. Evaluation Criterion H— Nexus to Reclamation <br />Describe the nexus between the proposed project and a Reclamation project or Reclamation <br />activity. Please consider the following: <br />• Does the applicant have a water service, repayment, or O&M contract with <br />Reclamation? <br />No, the City does not have a water service, repayment or O&M contract with Reclamation. <br />• If the applicant is not a Reclamation contractor, does the applicant receive Reclamation <br />water through a Reclamation contractor or by any other contractual means? <br />Yes, the City of Santa Ana is a member agency of MWD who imports water from the Colorado River and <br />Delta via the SWP and Colorado River Aqueduct (CRA), respectively. The CRA diverts water from the <br />Colorado River at Lake Havasu which is operated by Reclamation. <br />• Will the proposed work benefit a Reclamation project area or activity? No. <br />• Is the applicant a Tribe? No. <br />E. PERFORMANCE MEASURES <br />The City of Santa Ana proposes to use the following performance measures to quantify the <br />benefits upon completion of the proposed project: <br />Performance Measure No. 1: Energy Generated <br />The measure of performance will be the actual amount of energy generated (kWh) resulting <br />from the construction of the Project. It is expected that the project will generate up to <br />1,316,942 kWh per year. After construction, and for two years following, the City will provide <br />energy reports for the kWh generated. <br />Performance Measure No. 2: Water Saved (Conserved) <br />The measure of performance will be the actual amount of water consumption reduced after <br />implementation of the Project, quantified as follows: <br />After project implementation, the City will monitor its energy savings as noted above and will <br />use the latest energy consumption of water data to estimate the amount of water conserved as <br />a result of reducing dependence on fossil fuel energy. <br />26 <br />PREVIEW Date: Nov 03, 2021 Workspace ID: WS00800354 Funding Opportunity Number: R22AS00023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.