My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 26 - Grant Application for Solar Power Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
12/07/2021 Regular
>
Item 26 - Grant Application for Solar Power Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 8:46:28 AM
Creation date
8/17/2023 11:57:11 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
26
Date
12/7/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
183
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Generation of Solar Power at Garthe and West Pump Station Facilities Project <br />0- <br />Bureau of Reclamation Water Energy and Efficiency Grant FY2022 <br />Fringe Benefits <br />The fringe benefits represent the City's Project Manager's fringe benefits and it is estimated <br />that they will spend —2 hours per week for the duration of the Project. <br />Travel <br />Not applicable. <br />Equipment <br />All equipment costs are included in the Contractual/Construction. <br />Materials and Supplies <br />All material and supplies costs are included in the Contractual/Construction. <br />Contractual/Construction <br />Through a competitive bid process in compliance with all applicable state and federal <br />requirements, a qualified Contractor will be selected to construct the Project. The construction <br />contract will include all relevant equipment, supplies and materials, construction, labor, and <br />management needed to construct the project (as detailed in Table 5) at both Garth and West <br />Pump Stations. <br />Third -Party In -Kind Contributions <br />Not applicable. <br />Environmental and Regulatory Compliance Costs <br />The cost to prepare the environmental documents will be part of the design component of the <br />Project. The $1,000 cost allocated here is for BOR to complete its environmental review. <br />Other Expenses <br />Not applicable. <br />Indirect Costs <br />Not applicable. <br />Total Costs <br />The total cost of the Project is expected to be $2,935,408. <br />29 <br />PREVIEW Date: Nov 03, 2021 Workspace ID: WS00800354 Funding Opportunity Number: R22AS00023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.