My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 27 - Conceptual Design Services for Dog Park Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
12/07/2021 Regular
>
Item 27 - Conceptual Design Services for Dog Park Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2023 11:59:09 AM
Creation date
8/17/2023 11:58:38 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
27
Date
12/7/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SANTA ANA DOG PARK, CITY OF SANTA ANADVD <br />15 <br />REVELANT PROJECT EXPERIENCE <br />There are no parks nor any available parklands in this section of <br />Buena Park. An initial opportunity to provide some dedicated park <br />facilities at Whitaker School has blossomed into a full of fl edged <br />“new” park across three acres of school yard. Through a series <br />of community outreach workshops a plan has emerged with <br />several exciting and unique elements. In addition to normal park <br />amenities, shaded picnic spaces, play lots restrooms, a jog path <br />and nice open spaces, there will be a STEM themed hardscape <br />plaza, unique geometric ground patterns and other creative play <br />spaces. The basketball court surface will be painted for fraction <br />ball, a math-based ball game. The running⁄walking track will have <br />distance markers. The universal accessible play lot is envisioned <br />to have fun, exciting, and challenging elements for all ages. This <br />fully lighted park will host sports activities, family gatherings, and <br />a myriad of recreation opportunities in this under served part of <br />the city. As the property is to be shared with Whitaker Elementary <br />School, a unique agreement between the City and the School <br />District will allow for this great joint use community facility. <br />Client: <br />City of Buena Park <br />Reference: <br />“David Volz Design has always <br />provided the City of Buena Park <br />with high-quality professional <br />services for these projects and <br />many others.” <br />Jim Box <br />Director of Community Services <br />(714) 562-3850 <br />jbox@buenapark.com <br />Key Elements: <br />• Universally Accessible play <br />lots <br />• Basketball Court <br />• Running⁄Walking Track <br />• STEM Elements <br />• Lighting <br />Services provided: <br />• Master Plan <br />• Community Outreach <br />• Construction Documents <br />• Construction Period Services <br />Start Date: June 2019 <br />Completion Date: In progress <br />Cost of Design: $331,911 <br />DVD Project Manager: <br />Eric Sterling <br />Staff : David Volz, Gary Vasquez, <br />Paul Cassar, Luis Pedraza <br />Subconsultants: Ardurra, Design <br />West Engineering, Shucri Yaghi <br />Consulting Engineers <br />More Buena Park Projects: <br />Rick Gomez ParkCommunity Gardens
The URL can be used to link to this page
Your browser does not support the video tag.