My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 27 - Conceptual Design Services for Dog Park Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
12/07/2021 Regular
>
Item 27 - Conceptual Design Services for Dog Park Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2023 11:59:09 AM
Creation date
8/17/2023 11:58:38 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
27
Date
12/7/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SANTA ANA DOG PARK, CITY OF SANTA ANA DVD <br />20 <br />DVD has an established quality control and assurance program that we undertake for all our design services, <br />and for this project. The Principal-in-Charge will be responsible for implementation of these Quality Control <br />measures. The primary elements include: <br />• Verifi cation that required deliverables and documents noted in the Scope of Work are provided. <br />• A Peer Review will be conducted by our senior professional staff to solicit critical comments and <br />verify correctness. <br />• Retention of documents with highlighted markings and red-line comments, and verifi cation that <br />required revisions are incorporated into the updated documents. <br />• Continual assessment and tracking of project schedule and budget against baseline data. <br />• A complete construction review for constructability and biddability of the complete PS&E package <br />will be assigned to experienced professionals on staff prior to fi nal submittal to our client. <br />Notice to <br />Proceed <br />Deliver <br />to Client <br />Project <br />Planning <br />Conceptual <br />Design <br />Design <br />Development <br />Final <br />Design <br />Final <br />Corrections Printing <br />1. Project Initiation <br /> Quality Assurance Review <br />• Goals and objectives defi ned <br />• Scope of work defi ned <br />• Budget identifi ed <br />• Schedule established <br />• Problem areas identifi ed <br />• Checklist prepared <br />2. Work Plan <br /> Quality Assurance Review <br />• Goals and objectives reviewed <br />• Work plan reviewed <br />• Alternative and <br /> preliminary solutions evaluated <br />• Recommended <br /> solutions defi ned <br />3. Design Confi rmation <br /> Quality Assurance Review <br />• Program and materials fi nalized <br />• Recommended solutions refi ned <br />• Final design defi ned <br />• Budget review <br />• Checklist reviewed <br />4. Constructability <br /> Quality Assurance Review <br />• Quality assurance check for <br /> completeness and format <br />• Verifi cation check for completeness <br />• Biddability and constructability <br />review <br />Cost Controls and <br />Quality of Design <br />with Rich Detailing <br />Online Public <br />Outreach Expertise <br />Community Inspired <br />Park Design <br />Award Winning <br />Park and Sports <br />Field Design <br />Experience in <br />Delivery of Projects <br />Creative Designers <br />of Public Spaces <br />SCOPE OF SERVICES & SCHEDULE
The URL can be used to link to this page
Your browser does not support the video tag.