My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Construction Funding and Construction Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
09/21/2021 Regular and Special
>
Item 21 - Construction Funding and Construction Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 11:31:14 AM
Creation date
8/17/2023 12:17:34 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
21
Date
9/21/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TITLE: <br />Main Street Rehabilitation: Edinger <br />to 1st <br />PROJECT CATEGORY: <br />Street Improvements <br />Arterial Street Rehabilitation <br />LOCATION MAP <br />N <br />w.-s � wx. n.s F0.eL Ea.v <br />mwu awnv Ecns � : $ � <br />AGENCY: <br />Public Works <br />CITY OF SANTA ANA FY21/22CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Preventative maintenance of existing pavement and <br />replacement/installation of missing or damaged curbs, gutters, <br />sidewalks, driveway approaches, and wheelchair ramps along Main <br />Street between Edinger Avenue and 1 st Street. <br />PROJECT NEED: <br />The City's Pavement Management Program has been developed to <br />identify total deferred maintenance requirements for the City's arterial <br />network and to move toward preventative maintenance. As one of the <br />City's arterial streets, Main Street pavement rehabilitation is identified <br />as a high priority in the Pavement Management Program. <br />PROJECT COSTS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 <br />Construction 750,000 - - - - - - <br />TOTAL 750,000 - - <br />SOURCE OF FUNDS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 <br />GAS TAX 750,000 - - - - - - <br />TOTAL 750,000 - - - - - - <br />DIVISION: <br />C/P Engineering <br />CONTACT: <br />Sean Thomas, Senior Civil Engineer <br />DATE: <br />24-Aug-2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.