My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 24 - Tustin Avenue Corridor Traffic Signal Synchronization Project (Project 21-6983)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
09/21/2021 Regular and Special
>
Item 24 - Tustin Avenue Corridor Traffic Signal Synchronization Project (Project 21-6983)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2023 12:18:43 PM
Creation date
8/17/2023 12:18:26 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
24
Date
9/21/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TUSTIN AVENUE/ROSE DRIVE <br />RTSSP GRANT APPLICATION OCTOBER 2019 <br />233 Cobalt ATC TS2 Type 2 Controller & Appurtenances EA 1 500.00$ 5,000.00$ 5,500.00$ 1,100.00$ Tustin <br />234 Polara Navigator iN2 APS W/ 5x7 R10-3B Braille Signs EA 8 170.00$ 450.00$ 4,960.00$ 992.00$ Tustin <br />235 Polara Navigator iN2 APS Controller Assembly EA 1 800.00$ 2,500.00$ 3,300.00$ 660.00$ Tustin <br />236 Radar Detection LS 1 5,000.00$ 20,000.00$ 25,000.00$ 5,000.00$ Tustin <br />1,900,520.00$ 380,104.00$ 17,890.00$ <br />190,052.00$ 38,010.40$ $ - <br />285,078.00$ 57,015.60$ $ - <br />-$ (17,890.00)$ <br />2,375,650.00$ 457,240.00$ 17,890.00$ <br />Subtotal: <br />Contingency (10%): <br />Construction Management (15%): <br />In-Kind Match <br />SYSTEM IMPROVEMENT TOTAL: <br />Yorba St/Irvine Blvd <br />13
The URL can be used to link to this page
Your browser does not support the video tag.