My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 24 - Tustin Avenue Corridor Traffic Signal Synchronization Project (Project 21-6983)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
09/21/2021 Regular and Special
>
Item 24 - Tustin Avenue Corridor Traffic Signal Synchronization Project (Project 21-6983)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2023 12:18:43 PM
Creation date
8/17/2023 12:18:26 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
24
Date
9/21/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TUSTIN AVENUE/ROSE DRIVE <br />RTSSP GRANT APPLICATION OCTOBER 2019 <br />Senior Engineer 22 $150.00 $3,300.00 <br />Traffic Signal System <br />Supervisor 33 $135.00 $4,455.00 <br />Traffic Signal System <br />Specialist 54 $125.00 $6,705.00 <br />$17,430.00 <br />City of Anaheim Engineering Intern 168 $20.00 $3,360.00 <br />$3,360.00 <br />$34,190.00 <br />$34,190.00 <br />*Total amount is the required participation by the identified agency. The number of hours and hourly rate will be based on each agency’s actual fully burdened billing rates, <br />which must collectively equal the same value of the assigned “Total” dollars. Each agency will be responsible for keeping detailed records of hours worked and description <br />of work. An accounting record of personnel, hours at fully burdened rate is expected to be included with the final submittal. Records will be subject to auditing. <br />Total for City of Yorba Linda : <br />Drive Corridor and reports <br />Total for City of Anaheim: <br />Total Staffing Commitment (ii): <br />TOTAL IN-KIND MATCH* (i + ii): <br />City of Yorba Linda <br />PS&E, Traffic Signal Timing, Timing <br />Implimintation and Ststem integration Review, QA <br />PS&E, Traffic Signal Timing, Timing <br />Implimintation and Ststem integration Review, QA <br />Construction Observation <br />11
The URL can be used to link to this page
Your browser does not support the video tag.