My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 28 - Water Well, Pump, and Motor Rehabilitation and Repair Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
08/17/2021 Regular
>
Item 28 - Water Well, Pump, and Motor Rehabilitation and Repair Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 11:53:28 AM
Creation date
8/17/2023 4:08:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
28
Date
8/17/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
O QUALITY CONTROL <br />Layne utilizes a large number of reporting <br />measures to ensure quality assurance and <br />quality control for our drilling and test <br />pumping operations. <br />These reports would be utilized throughout the project. A <br />typical summary of the items covered in our program would <br />include the following: Non -DOT and DOT travel, rig up <br />operations, review of well design, daily shift reports, daily <br />safety inspections, tailgate meetings per working shift, <br />drilling operations (mud properties, deviation survey, pipe <br />tally, etc.), material inspections prior to installation, well <br />installation (mud thinning operations, casing/screen/tremie <br />tally, annular material installation <br />(actual vs theoretical), etc.), well development <br />(methodology/time spent per foot of screen, material <br />recovered, water quality parameters and test pumping <br />(water quality, sand content, etc.). Copies of our reporting <br />measures are provided to the Owner. Project <br />specifications are reviewed prior to field work and any <br />project specific items that are not covered in our normal <br />QA/QC program are added to meet the needs of the <br />project. <br />NOISE REDUCTION <br />!100 Layne has the ability to self -perform the <br />installation of sound walls or subcontract this <br />service out. <br />A larger number of our drilling operations are completed in <br />urban areas where sound minimization is required. In <br />addition to installing sound walls, Layne uses whisper quiet <br />generators and sound mitigating mufflers on other <br />equipment. <br />CITY OF SANTA ANA <br />Layne RFP NO.: 21-059 WATER WELL, PUMP AND MOTOR REHABILITATION AND REPAIR SERVICES 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.