My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 13 - Sewer System Repair Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
07/20/2021 Regular
>
Item 13 - Sewer System Repair Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 12:05:56 PM
Creation date
8/17/2023 5:13:14 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
13
Date
7/20/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(- n (�'j <br />be used 24hoursi p0rd'Ay, in addition to lh'e offi(."'e phow,,, j <br />cjurin( reg wol <br />Mobilization efforts area iniHated pron,lptly to line-up labor, equipurient, r-riaterials, and <br />subcontroo,tors for the given emergency. The project supervision has the authority to <br />direct the deployment of resources to meet the needs to any ernergOVIGY. <br />As with all construction projects, safety and affective communication will take priority <br />over any work activities. All our personnel maintain certification in First Aid/CPR and <br />Confined Space Entry, as well Competent Person Training. Prior to entering any zone, <br />we will perform a visual site assessment to identify potential risks and hazards <br />associated with site access for both personnel and equipment. Once the risks and <br />hazards have been identified, mitigation as needed will be implemented. All this <br />information will be communicated to the Owner and Interested Parties, as well as our <br />own work force and subcontractors. Any emergency repair and/or maintenance activity <br />work will be implemented with consent from the Owner. <br />Additional resources such as shoring systems, pipe and fittings, aggregates, and <br />asphalt are readily available and will be sourced as needed from the nearest feasible <br />source. In addition, MPS has good standing relationships with multiple subcontractors <br />specializing in Saw -cutting, manhole and structure construction, pipe -bursting, top -hat <br />installation, lateral lining and Clean & CCTV work with extensive experience. <br />X <br />
The URL can be used to link to this page
Your browser does not support the video tag.