Laserfiche WebLink
�. tef��odel Manhole Base <br />jy <br />(As -Needed) <br />6. Construct New Manhole Not More <br />Than S' 0eep per Standard Plan <br />1201 (As-Neoded) <br />EA <br />7. Construct New Manhole Between <br />3'-12' Deep per Standard Plan 'i20'I <br />(As --Needed) <br />EA <br />o_ Raise Existing Manhole Frame and <br />Cover, and replace collar to Grade <br />per Standard Plan 120'1 <br />t=A <br />(As -Needed) <br />9. Replace Manhole Cover Concrete <br />Collar per Standard Plan 1201 <br />(As -Needed) <br />PA <br />10. <br />Furnish and Install Traffic Loop <br />EA <br />11. <br />Provide Sewer Lateral Lining with <br />EA <br />Cleanout, 4" and G" Sewer Lateral <br />Pipe (As -Needed) <br />'12. <br />Provide Top Hat Repairs, 4" and 6" <br />EA <br />Sewer Lateral Pipe (As -Needed) <br />13. <br />Provide Pipe Bursting Repair with <br />Cleanout, 4" and 6" Sewer Lateral <br />Pipe per Standard Plan 1204A (As- <br />EA <br />Needed) <br />14. <br />Provide Open Trench <br />Repair/Replacement with Cleanout, <br />4" and 6" Sewer Lateral Pipe per <br />EA <br />Standard Plan 1204 (As -Needed) <br />l0 •1; 2,c3Uo `_Z <3Oy°r <br />50 $ I q°o `7 eau <br />o $ Z—Lj $ 2-L4 Of o " <br />30 $ <br />30 $z 6ay $T6.vo o— <br />5 $ 7 a o $ 3 5oo <br />60 $ 116 o $ L4 eru � <br />40 $ �aaD $ j24 060— <br />25 $_I� of o $_ 35U oou- <br />25 $ 170 do $ <br />�3 oov <br />UP 21-036 Addendum One <br />May 17, 2021 <br />5of7 <br />