PEI
<br />PAULUS ENGINEERING, INC.
<br />PIPELINIE CONSTRUCTION
<br />Storm Drain * Water * Sewe
<br />fsloblished 1 M
<br />(714) 632-3975 % infn@po 5engineering.cor
<br />Las Perillas Pumping Plant Repairs, Department of Water Resources, Kettleman City, CA, Project Superintendent, $2M.
<br />Brutoco removed and replaced a section of 78-inch diameter steel pipe in two existing penstocks at the Las Perillas
<br />Pumping Plant south of Kettleman City. The existing penstock piping had corroded through over the years causing leaks and
<br />erosion of the existing slopes. The work, which included coating repair to the existing pipes, was completed around the
<br />clock during a three week period.
<br />Ramona Avenue Grade Separation, Alameda Corridor East (ACE), PI Monte, CA, Utilities Superintendent, $18M. Scheduled
<br />and supervised underground utilities construction including 72-inch storm drain pipe that was jacked under Union Pacific
<br />Railroad and Metrolink track. This grade separation construction project included construction of two shooflies and bridges
<br />for UPRR and Metrolink trains, retaining walls, roadway and intersection improvements, drainage, electrical and pump
<br />station construction.
<br />Robert Diemer Solids Handling and Maintenance Facilities, Metropolitan Water District of Southern California, Yorba
<br />Linda, CA, utilities Superintendent, $34M. Responsible for the underground utility work including installation of a 30-inch
<br />waterline, storm drain, sewer lines, and yard piping for this water treatment plant. The new facilities constructed for MWD
<br />included a new solids dewatering facility building housing three belt filter presses, an electrical room, polymer storage and
<br />mixing equipment, and three cake pumps; a truck loading facility; four elevated solids storage hoppers, and two gravity
<br />thickeners.
<br />SR-91 Widening at Jackson Street, Caltrans, Riverside, CA, Utilities Superintendent, $18M. Planned and managed extensive
<br />storm drain work and waterline construction for this SR-91 freeway widening project including jacking a 36-inch waterline
<br />under the 91 freeway 35 feet below grade. The project added lanes for SR-91 in Riverside, replaced the Jackson Street
<br />bridge, widened five bridges and construct retaining walls between Van Buren Boulevard and Arlington Avenue.
<br />SR-22f SR-55 Interchange, Caltrans, Orange, CA, Utilities Superintendent, Responsible for mechanical crew planning and
<br />oversight for this Caltrans interchange project. Managed storm drain pipe installation up to 95-inch RCP and box culvert
<br />construction. Scope of work included removal and replacement of the ESR-22 to NSR-55 flyover connector, bridge
<br />widenings, a new off -ramp, widening of the SR-55 freeway, retaining wall and sound wall construction.
<br />Certifications and Training
<br />OSHA 10 Hour Certified
<br />OSHA 30 Hour Certified
<br />First Aid & CPR Certified
<br />BNSF and Metrolink Safety Trained
<br />Fall Protection Certified
<br />Crosby Rigging Certified
<br />Excavation Safety Trained
<br />Confined Space Competent Person
<br />Wet Uhlily Pipeline Professionals* 7871 E. Coronado St., Anaheim, CA 92806 • www.pnuluseriginwingsom
<br />Paulus Engineering, Inc. • Genetol Engineering Cenh Mi hi 724114