Laserfiche WebLink
0 <br />buntich <br />d. Understanding of Scope and Services <br />MBC has thoroughly reviewed RFP 21-036 Sewer System Repair Services. This project includes sewer system <br />repair services on an as -needed basis, of which can be awarded to up to 3 firms. The City of Santa Ana services <br />over 343,000 people, covers an area of over 27.2 miles, contains 400 miles of sanitary sewer, 9,000 manholes, <br />48,500 sewer laterals, and 2 sewer lift stations which will convey the sewage to the Orange County Sanitation <br />District for Treatment. <br />Our responsibilities once awarded the agreement will be to be available on an On Call basis ready to respond <br />upon request. We will provide a 24-hoerrr response time. The basis of which is to provide lump sum pricing for <br />certain requested activities along with Time and Materials services, when directed. We will obtain and pay for a <br />fire hydrant meter permit to fill our water tank or other equipment, to provide water for compaction, as well as <br />water for dust control. Any of our intended subcontractors will be presented for approval prior to utilization <br />through the City of Santa Ana. <br />MBC specializes in dealing with sewer systems that are in densely populated urban areas that are either in <br />current usage, bypassed, or diverted. We own operate and maintain bypassing pumps, plugs, and flow through <br />diversion plugs so that we can successfully perform these repairs without sewer leaks or spills. We are staged <br />and ready to perform any sewer line replacement, installation, or rehabilitation set forth in this project. We will <br />self -perform the following scopes of work: Traffic Control, Demolition, Excavation, Shoring, Subgrade <br />Preparation, Pipeline Repair/Rehabiiitationllnstallation, Encasements, Brick Maintenance Hole Repair, Backfill, <br />Base Paving, CCTV inspections, Scheduiing, Safety, Management, and Quality Control. <br />A small list of repairs was identified in the RFP however MBC is staged and ready to perform other scopes in <br />addition to what is listed, if required. Focusing an the items identified in the RFP we will be called upon to <br />repair/replace 6", 8", 10", and 12" sewer mains varying in depths from less than 8' deep and less than 12' <br />deep. In addition to the stated depths, gravity sewer mains quite often go deeper than 12' and when that <br />situation presents, we possess in-house equipment to safely shore these excavations. We will complete these <br />repairs with our own forces. The equipment required for these repairs is currently in stock in our 8-acre <br />warehouse which is located just 25 miles north of the city. Therefore, we are able to respond to any repair at <br />any time. <br />Some repairs may require upsizing and rechanneling of flow. We will self -perform the remodeling of any sewer <br />manhole bases. When the need arises for installing new manholes we will perform the excavation and <br />preparation for the new manhole. If the manhole is a cast in place manhole we will commission the services of <br />one of our trusted subcontractors that we have worked hand in hand with over the past 4 decades to perform <br />the cast- in -place section. MBC will then stack the manhole shafting and set the cover to grade. On existing <br />manholes that require an adjustment to grade, or the existing collar needs to be replacement we will also self - <br />perform this scope of work. <br />When lateral services are in need of repair, MBC will provide all of the access, flow diversion, demolition, clean <br />out installations, and backfill to perform the lining or pipe bursting. We will subcontract the lining, top hat repairs, <br />and pipe bursting to qualified subcontractors with whom we have worked with in the past. <br />We understand that the mark ups are identified as 20% on Labor, 15% on Material, -15% on Equipment Rental, <br />15% on Other Items and Expenditures and 1% will be added for bonding. <br />After MBC receives a notification of a requested repair-, our project manager will immediately visit the site, inspect <br />the area for what the repair methods will be, document the existing conditions, and create a project file for the <br />repair. if requested by the City of Santa Ana, we will immediately provide a lump sum proposal for the work. If <br />Page 8 of 12 <br />