Laserfiche WebLink
RFP No. 21-001 for Pre-Approval Accessory Dwelling Unit Plans <br />Design Path Studio Proposal <br />Design Path Studio + checkerboardSTUDIOS - Page 9 <br />All tasks listed below will be managed by Design Path Studio. Sub-consultants will be responsible for <br />code compliance and any deliverables provided by sub-consultants will be supervised and reviewed <br />by Design Path Studio prior to review by the City of Santa Ana. Our team has a proven track record <br />of producing quality results, on-time and on-budget, even while navigating the challenges of creating <br />WKH¿UVWVXFFHVVIXOSHUPLWUHDG\$'8SURJUDPLQWKHVWDWH <br />checkerboardSTUDIOS: ADU Regulations and Design Consultant <br />&RQWDFW*HR໤UH\3ODJHPDQQ <br />a: 2640 Worden Street, Unit 208, San Diego, CA 92110 <br />p: 304-951-118 <br />e: JHR໤UH\#FKHFNHUERDUGVWXGLRVFRP <br />D&R Calcs: Title 24 Energy Consultant <br />Contact: Diane Mendoza <br />a: 14107 Ipava Drive, Poway, CA 92064 <br />p: 858-486-9506 <br />e: diane@dandrcalcs.com <br />Structural Engineer Consultant (if required) <br />7%'SULRUWR¿QDOL]LQJFRQWUDFW <br />Task A: Meetings + Project Schedule (2 weeks) <br />Deliverables: Schedules, Agendas, and Meeting Minutes <br />&RQVXOWDQWVKDOODWWHQGDNLFNR໤PHHWLQJZLWK&LW\6WD໤WRUH¿QHWKHVFRSHRIVHUYLFHV <br />timeline, and steps for completion of the ADU building plans. <br />7KHNLFNR໤PHHWLQJZLOOHVWDEOLVKSURWRFROVIRUFRPPXQLFDWLRQSURJUHVVPHHWLQJVDQGFODULI\ <br />project objectives and deliverables. <br />3. Consultant will schedule, prepare agendas, and draft minutes for all monthly team progress <br />meetings. <br />Task B: Pre-approved ADU Plans (20 weeks) <br />To be consistent with standard professional practice we propose the following design plan in order to <br />UH¿QHWKHGHVLJQVZKLOHZRUNLQJZLWK&LW\6WD໤7KLVDOORZV6WD໤WRWKLQNWKURXJKWKHGHVLJQDQGDQ\ <br />factors impacting the integration of the prototypical design with existing conditions that cannot be <br />predicted. <br />1: Schematic Design <br />Deliverables: Floor plans, Elevations <br />4. WORK PLAN <br />See Project Schedule for more detail.