Laserfiche WebLink
AESC O <br />AESCO Proposal No. P6513 <br />Statement of Qualifications <br />Tariq Abdullah <br />Senior Laboratory Technician <br />Mr. Tariq Abdullah has over 15 years of experience in the field and in laboratory testing of construction <br />materials such as concrete, steel, asphalt, and soils. Tariq is experienced in conduction ---------------------, <br />testing in accordance with ASTM, AASHTO and Caltrans. Mr. Abdullah is proficient in Education: <br />conducting sieve analysis, testing of asphalt concrete using Marshall Max, specific gravity Karachi University, <br />(Rice), ignition method for extraction/gradation, flow stability and moisture content from Pakistan. B.S. <br />microwave oven methods. He is adept in the use of Hveem method for stability and Geologic Science, <br />paraffin max density for specific gravity at 25 degrees Celsius. Tariq has also tested and 1988. <br />fabricated concrete cylinders, mortars, prisms, masonry cores and grout samples to <br />determine concrete strength through use of the compressive strength machine; and is Professional <br />proficient in the laboratory testing of soil including moisture content, plasticity index, Certifications: <br />expansion, particle size analysis, R-Value, direct shear, consolidation, etc. Mr. Abdullah is ACI <br />also experienced in the testing and inspection of soil and asphalt during grading. Caltrans <br />NICET <br />---------------------- <br />Specific Project Experience <br />Widening of the 1-405 Freeway, Euclid St. to 1-605-Orange County, CA <br />Senior Laboratory Technician: Mr. Abdullah is the Senior Laboratory Technician for the Quality Verification <br />materials testing and inspection during widening of the 1-405 Freeway between Euclid Street and the 1-605 <br />Freeway, a total of 16 miles, for OCTA and Caltrans. The widening project includes construction of new lanes <br />on the southbound and northbound sides, retaining walls, bridges, etc. The testing and inspection services <br />include a review of concrete mix designs, concrete testing and inspection, concrete batch plant inspection, pile <br />inspection and logging, rebar inspection, aggregate testing, welding inspection, subgrade testing and <br />inspection, base material evaluation and testing, compaction testing and inspection, and asphaltic concrete <br />testing. Mr. Chamaa also prepared the Quality Manual for the project including all forms. <br />Sand Canyon Grade Separation -Irvine, CA <br />Senior Laboratory Technician: Mr. Abdullah is the Senior Laboratory Technician for the Sand Canyon Grade <br />Separation project at the 5 Freeway in Irvine for Caltrans and OCTA. The project includes the construction of a <br />rail underpass, retaining walls, railroad relocation, storm drains, utility relocations, Sand Canyon Avenue <br />relocation, and a new pump station. Mr. Mikhail performed inspection and testing of the compaction, asphalt, <br />subgrade, structural backfill, and foundation excavations. <br />Warner Avenue Gravity Sewer Lift Station C — City of Huntington Beach, CA <br />Senior Laboratory Technician: Mr. Abdullah is the Senior Laboratory Technician for the construction materials <br />testing and inspection and for the geotechnical and environmental Phase II investigations for a new lift station <br />facility. The project consisted of the replacement of the existing Lift Stations B and C and the Sunset Beach <br />Sanitary Lift Station with a new Lift Station C. The submersible lift station incorporated a 14 foot by 26 foot by <br />22 foot deep wet well. The bottom of the well foundation was approximately 26 to 27 feet below existing <br />grade. The new lift station also included an 8-foot deep valve vault which was 15 feet by 10 feet in plan <br />dimension, a 60 kW outdoor generator, and electrical panels. <br />Construction Material Testing/ Inspection , <br />Environmental and Geotechnical Engineering Services 33 I a y e b' u i 2 d i u ty df r� e z l c a <br />www.AescoTech.com 7 z a m % 4 e Cf z a u u d 'U A <br />