Laserfiche WebLink
AESCO <br />T170 <br />T171 <br />T172 <br />T177 <br />T178 <br />T179 <br />Sched u le of Fees <br />Effective January 2021 <br />FieldCoring Technician................................................................................................$ 115 <br />Nondestructive Examination Technician, UT, MT, LP ................................................$ 120 <br />Structural Steel Fabrication Inspector (AWS)............................................................$ 120 <br />Senior Environmental Technician...............................................................................$ 125 <br />Environmental Technician...........................................................................................$ 120 <br />BuildingInspector........................................................................................................$ 130 <br />Fabrication Shop Inspections Cost (per hour) <br />T173 Structural Steel Inspector(ICC/CBO)..........................................................................$ 115 <br />T174 Structural Steel Inspector(AWS)................................................................................$ 115 <br />T175 Batch Plant Quality Control Technician/Inspector....................................................$ 115 <br />T176 Reinforced Concrete, Prestressed Inspector.............................................................$ 115 <br />Field Inspector/Technician Hours <br />No Work Performed (Work Cancelled)..................................................................................Minimum 2-hour Charge <br />All field services charge............................................................................Minimum4 and 8-hour Charge Thereafter <br />Regular Work Hours <br />First 8 hours, Monday through Friday, between 5:00 a.m. to 5:00 p.m. <br />Direct Project expenses outside services will be charged at Cost+ 15%. <br />Time and One -Half <br />Any increment past first hours through 12 hours, Monday through Friday <br />First 12 hours on Saturday <br />Shift between 3:00a.m. and 5:00a.m. <br />Double Time <br />Any hours past 12 hours Monday through Saturday, all day Sunday and Federal Holidays <br />Field Analysis <br />Cost <br />(per hour unless <br />otherwise noted) <br />G200 <br />Soil Boring with HoIlow Stem Auger DrilIing Portal to Portal, per hour ...................$ <br />395 <br />G201 <br />Backfill Boreholes with Bentonite, perfoot...............................................................$ <br />25 <br />G202 <br />Backfill Boreholes with Grout, per foot......................................................................$ <br />35 <br />G203 <br />Drumming and Disposal of Clean Cuttings, per drum ...............................................$ <br />390 <br />G204 <br />Fire Water Buffalo, perday.........................................................................................$ <br />550 <br />G205Support <br />Truck,perday................................................................................................$ <br />150 <br />G206Water <br />Truck, per day...................................................................................................$ <br />450 <br />G207 <br />Mobilization and Demobilization for Rock coring, each ...........................................$ <br />1150 <br />G208 <br />Rock Coring, per hour..................................................................................................$ <br />455 <br />G209 <br />Decontamination ofVehicle and Equipment, each ...................................................$ <br />300 <br />G210 <br />Field Resistivity, up to 3 arrays, maximum distance of40 ft., each .........................$ <br />1800 <br />G211 <br />Environmental Soil Boringwith Hollow Stem Auger Portal to Portal, per hour <br />...... $ <br />425 <br />Page 2 of 8 Construction Material Testing/ Inspection <br />Environmental and Geotechnical Engineering <br />www.AescoTech.com <br />