Laserfiche WebLink
. Sched u le of Fees <br />Effective January 2021 <br />AESCO <br />Concrete Coring Services COSt (per test) <br />C423 Equipment Concrete (4 and8 hour minimum), perhour................................... $ 200 <br />Individual Core Prices (all prices arefor a four core minimum job): <br />C424 Slab on Grade Coringfor 2",3" and 4" Diameter(first 6" depth)each. $ 70 <br />C425 Slab on Grade Coringfor6" and 8" Diameter(first6" depth) each...... $ 75 <br />C426 Slab on Grade Concrete Core (price per inch after6" depth) ............... $ 10 <br />C427 Wall Cores 2"13" and 4" (first 6" in depth) each .................................. $ 85 <br />C428 Wall Concrete Core (price perinch after 6" in depth), per inch ........... $ 10 <br />(Wall core pries based on Contractor supplying access to area to be cored) <br />Miscellaneous Concrete Coring Prices: <br />C429 Patching Slab on Grade Cored Holes with 2500 psi Concrete Patch, <br />each.............................................................................................................$ 20 <br />C430 Thickness Determination perASTM C42, each ........................................$ 20 <br />C431 Compression Strength Determination......................................................$ 65 <br />Asphalt Concrete Coring Services <br />Cost (per test) <br />Alternate Individual Core Prices (all prices are fora four core minimumjob): <br />A661 <br />Asphaltic Concrete Cores 2",3" and 4" Diameter (First 6" in depth), <br />each.............................................................................................................$ <br />70 <br />A662 <br />Asphaltic Concrete Cores 6" and 8" Diameter (First 6" in depth), <br />each.............................................................................................................$ <br />70 <br />A663 <br />Asphaltic Concrete Cores price per inch after 6" in depth, each ............ <br />$ <br />10 <br />Miscellaneous Asphaltic Coring Prices: <br />A664 <br />Patching of Core Drilled Holes Using Cold Patch Material, each ............ <br />$ <br />30 <br />A665 <br />Thickness Determination perASTM C42, each ........................................$ <br />35 <br />A666 <br />Specific Gravity for Determination of Percent Compaction per <br />ASTM D 2726, each...................................................................................$ <br />45 <br />A667 <br />Specific Gravity for Determination of Percent Compaction by <br />Paraffin, each............................................................................................$ <br />65 <br />Environmental Tests <br />Cost (per test) <br />N800 <br />Asbestos Polarized Light Microscopy(PLM) 3-DayTurnaround, each .....................$ <br />20 <br />N801 <br />Asbestos Polarized Light Microscopy(PLM) 24-Hour Turnaround, each .................$ <br />40 <br />N802 <br />Asbestos Polarized Light Microscopy(PLM) 8-HourTurnaround, each ...................$ <br />70 <br />Page 8 of 8 Construction Material Testing/ Inspection <br />Environmental and Geotechnical Engineering <br />www.AescoTech.com <br />