My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 29 - Proposed Fiscal Year 2021-22 City Budget
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
06/01/2021 Regular
>
Item 29 - Proposed Fiscal Year 2021-22 City Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2023 4:32:07 PM
Creation date
8/21/2023 4:26:15 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
29
Date
6/1/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
979
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA FY 21/22CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />To provide inter-agency traffic signal coordination and infrastructure <br />upgrades on First Street/ Bolsa Avenue from Bolsa Chica Street in <br />City of Huntington Beach through the Cities of Westminster, Santa <br />Ana and County of Orange to Newport Avenue in City of Tustin. The <br />project involves the Cities of Santa Ana, Huntington Beach, <br />Westminster, Tustin, and County of Orange. <br />PROJECT NEED: <br />OCTA Traffic Signal Synchronization Master Plan identified that First <br />Street/ Bolsa Avenue Corridor is part of countywide corridor system <br />that needs multi-jurisdiction synchronization. This project will provide <br />traffic signal upgrades and synchronize traffic signals across <br />jurisdictional boundaries to reduce traffic congestion and maintain the <br />synchronization improvements for 3 years. <br />PROJECT TITLE: <br />First Street Corridor Traffic Signal <br />Synchronization <br />PROJECT CATEGORY: <br />Traffic Improvements <br />Traffic Improvements <br />LOCATION MAP <br />AGENCY:DIVISION:CONTACT:DATE: <br />Public Works Traffic Engineering Cesar Rodriguez, Senior Civil Engineer 07-May-2021 <br />PROJECT COSTS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 <br />Construction 340,000 ------ <br />Engineering 40,000 ------ <br />TOTAL 380,000 ------ <br />SOURCE OF FUNDS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 <br />M2 LOCAL FAIRSHARE 380,000 ------ <br />TOTAL 380,000 ------ <br />17
The URL can be used to link to this page
Your browser does not support the video tag.